My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01610 <br /> TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br /> 1 . 1 GENERAL <br /> A . Make all arrangements for transportation , delivery and handling of equipment <br /> and materials required for prosecution and completion of the Work . <br /> B . Shipments of materials to CONTRACTOR or Subcontractors shall be delivered <br /> to the site only during regular working hours . Shipments shall be addressed and <br /> consigned to the proper party giving name of Project , street number and city . <br /> Shipments shall not be delivered to OWNER except where otherwise directed . <br /> C . If necessary to move stored materials and equipment during construction , <br /> CONTRACTOR shall move or cause to be moved materials and equipment <br /> without any additional compensation . <br /> 1 . 2 DELIVERY <br /> A . Arrange deliveries of products in accord with construction schedules and in <br /> ample time to facilitate inspection prior to installation . <br /> B . Coordinate deliveries to avoid conflict with Work and conditions at site and to <br /> accommodate the following : <br /> 1 . Work of other contractors , or OWNER . <br /> 2 . Limitations of storage space . <br /> 3 . Availability of equipment and personnel for handling products . <br /> 4 . OWNER' S use of premises . <br /> C . Do not have products delivered to project site until related Shop Drawings have <br /> been approved by the ENGINEER . <br /> D . Do not have products delivered to site until required storage facilities have been <br /> provided . <br /> E . Have products delivered to site in manufacturer' s original , unopened , labeled <br /> containers . Keep ENGINEER informed of delivery of all equipment to be <br /> incorporated in the Work . <br /> 01610- 1 <br /> F :\Engineering\Capital Projects\0744 - 8th St Sidewalk\0744 CONTRACT DOCUMENTS\01610 - Transportation and Handling of Materials <br /> and Equipment. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.