Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arrange for the use of all non - public haul routes crossing the property of <br /> any railroad . incur any expense for the use of such haul routes . Establish haul routes which <br /> will direct construction vehicles away from developed areas when feasible , and keep noise <br /> from hauling operations to a minimum . Advise the Engineer in writing of all proposed haul <br /> routes . <br /> 120 -5 . 3 . 2 Borrow Material for Shoulder Build -up : When so indicated in the <br /> plans , furnish borrow material with a specific minimum bearing value , for building up of <br /> existing shoulders . Blend materials as necessary to achieve this specified minimum bearing <br /> value prior to placing the materials on the shoulders . Take samples of this borrow material at <br /> the pit or blended stockpile . <br /> 120 -5 . 4 Materials Used at Pipes , Culverts , etc . : Construct embankments over and <br /> around pipes , culverts , and bridge foundations with selected materials . <br /> 120- 6 Embankment Construction . <br /> 120 -6 . 1 General : Construct embankments in sections of not less than 300 feet in <br /> length or for the full length of the embankment . <br /> 120 -6 . 2 Dry Fill Method : <br /> 120 -6 . 2 . 1 General : Construct embankments to meet compaction requirements <br /> in Article 120 - 7 and in accordance with the acceptance program requirements in 120 - 9 . <br /> Restrict the compacted thickness of the last embankment lift to 6 inches maximum . <br /> As far as practicable , distribute traffic over the work during the <br /> construction of embankments so as to cover the maximum area of the surface of each layer . <br /> Construct embankment in the dry whenever normal dewatering <br /> equipment and methods can accomplish the needed dewatering . <br /> 120 -6 . 2 . 1 . 1 For A-3 and A-2 -4 Materials with up to 15 % fines : <br /> Construct the embankment in successive layers with lifts up to a maximum compacted <br /> thickness of 12 inches . Ensure the percentage of fines passing the No . 200 US Standard <br /> sieve in the A-2 -4 material does not exceed 15 % . <br /> 120 -6 . 2 . 1 . 2 For A- 1 Plastic materials (As designated in FDOT Design <br /> Standard Index 505 ) and A-24 Materials with greater than 15 % fines : Construct the <br /> embankment in successive layers with lifts up to a maximum compacted thickness of <br /> 6 inches . <br /> 120 -6 . 2 . 1 . 3 Equipment and Methods : Provide normal dewatering <br /> equipment including , but not limited to , surface pumps , sump pumps and trenching/ digging <br /> machinery . Provide normal dewatering methods including , but not limited to , constructing <br /> shallow surface drainage trenches/ditches , using sand blankets , sumps and siphons . <br /> When normal dewatering does not adequately remove the water , <br /> the Engineer may require the embankment material to be placed in the water or in low <br /> swampy ground in accordance with 120 -7 . 2 . 4 . <br /> 120 -6 . 2 . 2 Placing in Unstable Areas : Where depositing the material in water , <br /> or in low swampy ground that will not support the weight of hauling equipment , construct the <br /> embankment by dumping successive loads in a uniformly distributed layer of a thickness not <br /> greater than necessary to support the hauling equipment while placing subsequent layers . <br /> Once sufficient material has been placed so that the hauling equipment can be supported , <br /> construct the remaining portion of the embankment in layers in accordance with the applicable <br /> provisions of 120-7 . 2 . 4 and 120 - 7 . 2 . 6 . <br /> 24 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-USI to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.