My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120 -6 . 2 . 3 Placing on Steep Slopes : When constructing an embankment on a <br /> hillside sloping more than 20 degrees from the horizontal , before starting the fill , deeply plow <br /> or cut into steps the surface of the original ground on which the embankment is to be placed . <br /> 120 -6 . 2 . 4 Placing Outside Standard Minimum Slope : Where material that is <br /> unsuitable for normal embankment construction is to be used in the embankment outside the <br /> standard minimum slope ( approximately one to two ) , place such material in layers of not more <br /> than 18 inches in thickness , measured loose . The Contractor may also place material which is <br /> suitable for normal embankment , outside such standard minimum slope , in 18 inch layers . <br /> Maintain a constant thickness for suitable material placed within and outside the standard <br /> minimum slope , unless placing in a separate operation . <br /> 120 -6 . 3 Hydraulic Method : <br /> 120 -6 . 3 . 1 Method of Placing : When the hydraulic method is used , as far as <br /> practicable , place all dredged material in its final position in the embankment by such method . <br /> Place and compact any dredged material that is rehandled , or moved and placed in its final <br /> position by any other method , as specified in 120 - 7 . 2 . The Contractor may use baffles or any <br /> form of construction he may select , provided the slopes of the embankments are not steeper <br /> than indicated in the plans . Remove all timber used for temporary bulkheads or baffles from <br /> the embankment , and fill and thoroughly compact the holes thus formed . When placing fill on <br /> submerged land , construct dikes prior to beginning of dredging , and maintain the dikes <br /> throughout the dredging operation . <br /> 120 -6 . 3 . 2 Excess Material : Do not use excess material placed outside the <br /> prescribed slopes , below the normal high -water level , to raise the fill . Remove only the portion <br /> of this material required for dressing the slopes . <br /> 120 -6 . 3 . 3 Protection of Openings in Embankment : Leave openings in the <br /> embankments at the bridge sites . Remove any material which invades these openings or <br /> existing channels without additional compensation to provide the same depth of channel as <br /> existed before the construction of the embankment . Do not excavate or dredge any material <br /> within 200 feet of the toe of the proposed embankment . <br /> 120-7 Compaction Requirements . <br /> 120 -7 . 1 Moisture Content : Compact the materials at a moisture content such that the <br /> specified density can be attained . If necessary to attain the specified density , add water to the <br /> material , or lower the moisture content by manipulating the material or allowing it to dry , as is <br /> appropriate . <br /> 120 -7 . 2 Compaction of Embankments : <br /> 120 -7 . 2 . 1 Earthwork Category 1 and 2 Density Requirements : Reduce the <br /> minimum required density from 100 % to 95 % of AASHTO T99 Method C for all earthwork <br /> items requiring densities . <br /> 120 -7 . 2 . 2 Earthwork Category 3 Density Requirements : Except for <br /> embankments constructed by the hydraulic method as specified in 120 - 6 . 3 , and for the <br /> material placed outside the standard minimum slope as specified in 120 - 6 . 2 . 4 , and for other <br /> areas specifically excluded herein , compact each layer of the material used in the formation of <br /> embankments to a density of at least 100 % of the maximum density as required by AASHTO <br /> T 99 , Method C . Uniformly compact each layer using equipment that will achieve the required <br /> density , and as compaction operations progress , shape and manipulate each layer as <br /> necessary to ensure uniform density throughout the embankment . <br /> 120 -7 . 2 . 3 Compaction Over Unstable Foundations : Where the embankment <br /> material is deposited in water or on low swampy ground , and in a layer thicker than 12 inches <br /> 25 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St- US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.