Laserfiche WebLink
( as provided in 120 - 6 . 2 . 2 ) , compact the top 6 inches (compacted thickness ) of such layer to <br /> the density as specified in 120 -9 . 5 . <br /> 120 -7 . 2 . 4 Compaction Where Plastic Material Has Been Removed : Where <br /> unsuitable material is removed and the remaining surface is of the A-4 , A- 51 A- 6 , or A- 7 Soil <br /> Groups , as determined by the Engineer, compact the surface of the excavated area by rolling <br /> with a sheepsfoot roller exerting a compression of at least 250 psi on the tamper feet , for the <br /> full width of the roadbed ( subgrade and shoulders ) . Perform rolling before beginning any <br /> backfill , and continue until the roller feet do not penetrate the surface more than 1 inch . Do <br /> not perform such rolling where the remaining surface is below the normal water table and <br /> covered with water . Vary the procedure and equipment required for this operation at the <br /> discretion of the Engineer . <br /> 120 -7 . 2 . 5 Compaction of Material To Be Used In Base , Pavement , or <br /> Stabilized Areas : Do not compact embankment material which will be incorporated into a <br /> pavement , base course , or stabilized subgrade , to be constructed as a part of the same <br /> Contract . <br /> 120 -7 . 2 . 6 Compaction of Grassed Shoulder Areas : For the upper inch layer <br /> of all shoulders which are to be grassed , since no specific density is required , compact only to <br /> the extent directed . <br /> 120 -7 . 2 . 7 Compaction of Grassed Embankment Areas : For the outer layer of <br /> all embankments where plant growth will be established , do not compact . Leave this layer in a <br /> loose condition to a minimum depth of 6 inches for the subsequent seeding or planting <br /> operations . <br /> 120 -7 . 3 Compaction of Subgrade : If the plans do not provide for stabilizing , compact <br /> the subgrade in both cuts and fills to the density specified in 120-9 . 5 . For undisturbed soils , do <br /> not apply density requirements where constructing narrowwidening strips or paved shoulders <br /> 5 feet or less in width . <br /> Where trenches for widening strips are not of sufficient width to permit the use <br /> of standard compaction equipment , perform compaction using vibratory rollers , trench rollers , <br /> or other type compaction equipment approved by the Engineer . <br /> Maintain the required density until the base or pavement is placed on the <br /> subgrade . <br /> 120-8 Backfilling Around Structures and Pipe. <br /> 120 -8 . 1 Requirements for all Structures : <br /> 120 -8 - 1 . 1 General : Backfill around structures and pipe in the Dry whenever <br /> normal deAtering equipment and methods can accomplish the needed dewatering . <br /> 129 -8 . 1 . 2 Equipment and Methods : Provide normal dewatering equipment <br /> including , but not limited to , surface pumps , sump pumps , wellpoints and header pipe and <br /> trenching/digging machinery . Provide normal dewatering methods including , but not limited to , <br /> constructing shallow surface drainage trenches/ditches , using sand blankets , perforated pipe <br /> drains , sumps and siphons . <br /> 120 -8 . 1 . 3 Backfill Materials : Backfill to the original ground surface or subgrade <br /> surface of openings made for structures , with a sufficient allowance for settlement . The <br /> Engineer may require that the material used for this backfill be obtained from a source entirely <br /> apart from the structure . <br /> Do not allow heavy construction equipment to cross over culvert or storm <br /> sewer pipes until placing and compacting backfill material to the finished earthwork grade or <br /> to an elevation at least 4 feet above the crown of the pipe . <br /> 26 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications .doc <br />