120 -8 . 1 . 4 Use of A-7 Material : In the backfilling of trenches , A- 7 material may <br /> be used from a point 12 inches above the top of the pipe up to the elevation shown on the <br /> FDOT Design Standards as the elevation for undercutting of A- 7 material . <br /> 120 -8 . 1 . 5 Time of Placing Backfill : Do not place backfill against any masonry <br /> or concrete abutment , wingwall , or culvert until the Engineer has given permission to do so , <br /> and in no case until the masonry or concrete has been in place seven days or until the <br /> specified 28 -day compressive strength occurs . <br /> 120 -8 . 1 . 6 Placement and Compaction : Place the material in horizontal layers <br /> not exceeding 6 inches compacted thickness , in depth above water level , behind abutments , <br /> wingwalls and end bents or end rest piers , and around box culverts and all structures <br /> including pipe culverts . When the backfill material is deposited in water , compact per 120 - <br /> 8 . 2 . 5 and 120 -8 . 3 . 4 . <br /> The Contractor may elect to place material in thicker lifts of no <br /> more than 12 inches compacted thickness outside the soil envelope if he can demonstrate <br /> with a successful test section that density can be achieved . Notify the Engineer prior to <br /> beginning construction of a test section . Construct a test section of 500 feet in length . Perform <br /> five tests at random locations within the test section . All five tests must meet the density <br /> required by 120 - 7 . 2 . Identify the test section with the compaction effort and soil classification <br /> in the Agency Logbook . In case of a change in compaction effort or soil classification , <br /> construct a new test section . When a test fails the requirements of 120 -7 . 2 , construct a new <br /> test section . The Contractor may elect to place material in 6 inches compacted thickness at <br /> any time . <br /> 120 -8 . 2 Additional Requirements for Structures Other than Pipe : <br /> 120 -8 . 2 . 1 Density : Where the backfill material is deposited in water, obtain a <br /> 12 inch layer of comparatively dry material , thoroughly compacted by tamping , before <br /> verifying the layer and density requirements . Meet the requirements of the density Acceptance <br /> Criteria . <br /> 120 -8 . 2 . 2 Box Culverts : For box culverts over which pavement is to be <br /> constructed , compact around the structure to an elevation not less than 12 inches above the <br /> top of the structure , using rapid -striking mechanical tampers . <br /> 120 -8 . 2 . 3 Other Limited Areas % Compact in other limited areas using <br /> mechanical tampers or approved hand tampers , until the cover over the structure is at least <br /> 12 inches thick . When hand tampers are used , deposit the materials in layers not more than <br /> 4 inches thick using hand tampers suitable for this purpose with a face area of not more than <br /> 100 int . Take special precautions to prevent any wedging action against the masonry , and <br /> step or terrace the slope bounding the excavation for abutments and wingwalls if required by <br /> the Engineer . <br /> 120 -8 . 2 . 4 Culverts and Piers : Backfill around culverts and piers on both sides <br /> simultaneously to approximately the same elevation . <br /> 120 -8 . 2 . 5 Compaction Under Wet Conditions : Where wet conditions do not <br /> permit the use of mechanical tampers , compact using hand tampers . Use only A- 3 material <br /> for the hand tamped portions of the backfill . When the backfill has reached an elevation and <br /> condition such as to make the use of the mechanical tampers practical , perform mechanical <br /> tamping in such manner and to such extent as to transfer the compaction force into the <br /> sections previously tamped by hand . <br /> 120 -8 . 3 Additional Requirements for Pipe 15 Inches Inside Diameter or Greater : <br /> 120 -8 . 3 . 1 General : Trenches for pipe may have up to four zones that must be <br /> backfilled . <br /> 27 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St- US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications . doc <br />