My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lowest Zone : The lowest zone is backfilled for deep undercuts up to <br /> within 4 inches of the bottom of the pipe . <br /> Bedding Zone : The zone above the Lowest Zone is the Bedding Zone . <br /> Usually it will be the backfill which is the 4 inches of soil below the bottom of the pipe . When <br /> rock or other hard material has been removed to place the pipe , the Bedding Zone will be the <br /> 12 inches of soil below the bottom of the pipe . i <br /> Cover Zone : The next zone is backfill that is placed after the pipe has <br /> been laid and will be called the Cover Zone . This zone extends to 12 inches above the top of <br /> the pipe . The Cover Zone and the Bedding Zone are considered the Soil , Envelope for the <br /> pipe . <br /> Top Zone : The Top Zone extends from 12 inches above the top of the <br /> pipe to the base or final grade . <br /> 120 -8 . 3 . 2 Material : <br /> 120 -8 . 3 . 2 . 1 Lowest Zone : Backfill areas undercut below the Bedding <br /> Zone of a pipe with coarse sand , or other suitable granular material , obtained from the <br /> grading operations on the project , or a commercial material if no suitable material is available . <br /> 120 -8 . 3 . 2 . 2 Soil Envelope : In both the Bedding Zone and the Cover <br /> Zone of the pipe , backfill with materials classified as A- 1 , A-2 , or A- 3 . Material classified as A- <br /> 4 may be used if the pipe is concrete pipe . <br /> 120 -8 . 3 . 2 . 3 Top Zone : Backfill the area of the trench above the soil <br /> envelope of the pipe with materials allowed on Design Standard , Index No . 505 . <br /> 120 -8 . 3 . 3 Compaction : <br /> 120 -8 . 3 . 3 . 1 Lowest Zone : Compact the soil in the Lowest Zone to <br /> approximately match the density of the soil in which the trench was cut . <br /> 120 -8 . 3 . 3 . 2 Bedding Zone : If the trench was not undercut below the <br /> bottom of the pipe , loosen the soil in the bottom of the trench immediately below the <br /> approximate middle third of the outside diameter of the pipe . <br /> If the trench was undercut , place the bedding material and leave it <br /> in a loose condition below the middle third of the outside diameter of the pipe . Compact the <br /> outer portions to meet the density requirements of the Acceptance Criteria . Place the material <br /> in lifts no greater than 6 inches (compacted thickness ) . <br /> 120 -8 . 3 . 3 . 3 Cover Zone : Place the material in 6 inches layers <br /> (compacted thickness ) , evenly deposited on both sides of the pipe , and compact with <br /> mechanical tampers suitable for this purpose . Hand tamp material below the pipe haunch that <br /> cannot be reached by mechanical tampers . Meet the requirements of the density Acceptance <br /> Criteria . <br /> 120 -8 . 3 . 3 . 4 Top Zone : Place the material in layers not to exceed <br /> 12 inches in compacted thickness . Meet the requirements of the density Acceptance Criteria . <br /> 120 -8 . 3 . 4 Backfill Under Wet Conditions : Where wet conditions are such that <br /> dewatering by normal pumping methods would not be effective , the procedure outlined below <br /> may be used when specifically authorized by the Engineer in writing . <br /> Granular material may be used below the elevation at which mechanical <br /> tampers would be effective , but only material classified as A- 3 . Place and compact the <br /> material using timbers or hand tampers until the backfill reaches an elevation such that it' s <br /> moisture content will permit the use of mechanical tampers . When the backfill has reached <br /> such elevation , use normally acceptable backfill material . Compact the material using <br /> mechanical tampers in such manner and to such extent as to transfer the compacting force <br /> into the material previously tamped by hand . <br /> 28 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.