My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
334 -6 . 2 Certification by the Contractor : On Asphalt Work Category 1 construction , <br /> the Engineer will accept the mix on the basis of visual inspection . Submit a Notarized <br /> Certification of Specification Compliance letter on company letterhead to the Engineer stating <br /> that all material produced and placed on the project was in substantial compliance with the <br /> Specifications . The Engineer may run independent tests to determine the acceptability of the <br /> material . <br /> 334 -6 . 3 Certification and Quality Control Testing by the Contractor : On Asphalt <br /> Work Category 2 construction , submit a Notarized Certification of Specification Compliance <br /> letter on company letterhead to the Engineer stating that all material produced and placed on <br /> the project was in substantial compliance with the Specifications , along with supporting test <br /> data documenting all quality control testing as described in 334 -6 . 3 . 1 . If so required by the <br /> Contract , utilize an Independent Laboratory as approved by the Engineer for the quality <br /> control testing . The mix will also require visual acceptance by the Engineer . In addition , the <br /> Engineer may run independent tests to determine the acceptability of the material . <br /> 334 -6 . 3 . 1 Quality Control Sampling and Testing Requirements : Perform <br /> quality control testing at a frequency of once per day . Obtain the samples in accordance with <br /> FDOT Method FM 1 -T 168 . Test the mixture at the plant for gradation ( P-$ and P-200 ) and <br /> asphalt binder content ( Pb ) . Test the mixture on the roadway for density using six- inch <br /> diameter roadway cores obtained at a frequency of three cores per day . <br /> Determine the asphalt content of the mixture in accordance with <br /> FM 5 - 563 . Determine the gradation of the recovered aggregate in accordance with FM 1 -T <br /> 030 . Determine the roadway density in accordance with FM 1 -T 166 . The minimum roadway <br /> density will be based on the percent of the maximum specific gravity ( Gmm ) from the <br /> approved mix design . If the Contractor or Engineer suspects that the mix design Gmm is no <br /> longer representative of the asphalt mixture being produced , then a new Gmm value will be <br /> determined from plant- produced mix with the approval of the Engineer . Roadway density <br /> testing will not be required in certain situations as described in 334-6 . 4 . 1 . Assure that the <br /> asphalt content , gradation and density test results meet the criteria in Table 334 -3 . <br /> Table 334 -3 <br /> Quality Control and Acceptance Values <br /> Characteristic Tolerance <br /> Asphalt Binder Content ( percent ) Target ± 0 . 55 <br /> Passing No . 8 Sieve ( percent ) Target ± 6 . 00 <br /> Passing No . 200 Sieve ( percent ) Target ± 2 . 00 <br /> Roadway Density (average of three cores 91 . 5 % Gmm <br /> Roadway Density an single core 90 . 0 % Gmm <br /> 334 -6 . 4 Quality Control Testing by the Contractor and Acceptance Testing by the <br /> Engineer : On Asphalt Work Category 3 , perform quality control testing as described in 334 - <br /> 6 . 3 . 1 . In addition , the Engineer will accept the mixture at the plant with respect to gradation <br /> ( P -8 and P-200 ) and asphalt binder content ( Pb ) . The mixture will be accepted on the roadway <br /> with respect to density . The Engineer will sample and test the material as described in 334- <br /> 6 . 3 . 1 . The Engineer will randomly obtain at least one set of samples per day . Assure that the <br /> asphalt content , gradation and density test results meet the criteria in Table 334 -3 . Material <br /> failing to meet these acceptance criteria will be addressed as directed by the Engineer . <br /> 334-6 . 4 . 1 Acceptance Testing Exceptions : When the total quantity of any mix <br /> type in the Project is less than 500 tons , or on Asphalt Work Category 1 construction , the <br /> 39 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.