My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
334 -5 . 10 . 3 . 1 . 2 Rolling Straightedge Exceptions : Testing with <br /> the rolling straightedge will not be required in the following areas : intersections , tapers , <br /> crossovers , parking lots and similar areas . In addition , testing with the rolling straightedge will <br /> not be performed on the following areas when they are less than 50 feet in length : turn lanes , <br /> acceleration /deceleration lanes and side streets . However , correct any individual surface <br /> irregularity in these areas that deviates from the plan grade in excess of 3/8 inch as <br /> determined by a 15 foot manual straightedge , and that the Engineer deems to be <br /> objectionable , in accordance with 334 - 5 . 10 . 4 . The Engineer may waive or modify <br /> straightedging requirements if no milling , leveling , overbuild or underlying structural layerwas <br /> placed on the project and the underlying layer was determined to be exceptionally irregular . <br /> 334 -5 . 10 . 3 . 1 . 3 Final Type SP Structural Layer : Straightedge the <br /> final Type SP structural layer with a rolling straightedge behind the final roller of the paving <br /> train . Correct all deficiencies in excess of 3/ 16 inch in accordance with 334 - 5 . 10 . 4 . 2 , and <br /> retest the corrected areas . <br /> 334 -5 . 10 . 3 . 1 . 4 Friction Course Layer : At the completion of all <br /> paving operations , straightedge the friction course . Correct all deficiencies in excess of 3/ 16 <br /> inch in accordance with 334 - 5 . 10 . 4 . 3 . Retest all corrected areas . <br /> 334-5 . 10 . 3 . 2 Asphalt Work Categories 1 and 2 : If required by the <br /> Engineer , straightedge the final structural layer with a rolling straightedge , either behind the <br /> final roller of the paving train or as a separate operation . Correct all deficiencies in excess of <br /> 5/ 16 inch in accordance with 334 - 5 . 10 . 4 . 2 . Retest all corrected areas . If the Engineer <br /> determines that the deficiencies on a bicycle path are due to field geometrical conditions , the <br /> Engineer will waive corrections with no deduction to the pay item quantity . <br /> 334 -5 . 10 . 4 Correcting Unacceptable Pavement : <br /> 334 -5 . 10 . 4 . 1 General : Correct all areas of unacceptable pavement at no <br /> additional cost . <br /> 334 -5 . 10 . 4 . 2 Structural Layers : Correct deficiencies in the Type SP <br /> structural layer by one of the following methods : <br /> a . Remove and replace the full depth of the layer , extending a <br /> minimum of 50 feet on either side of the defective area for the full width of the paving lane . <br /> b . Mill the pavement surface to a depth and width that is adequate <br /> to remove the deficiency . (This option only applies if the structural layer is not the final surface <br /> layer . ) <br /> 3344 . 10 . 4 . 3 Friction Course : Correct deficiencies in the friction course <br /> layer by removing and replacing the full depth of the layer , extending a minimum of 50 feet on <br /> either side of the defective area for the full width of the paving lane . Corrections may be <br /> . waived if approved by the Engineer . <br /> 334-6 Acceptance of the Mixture. <br /> 334 -6 . 1 General : The asphalt mixture will be accepted based on the Asphalt Work <br /> Category as defined below : <br /> 1 ) Asphalt Work Category 1 — Certification by the Contractor as defined in 334 - <br /> 6 . 2 . <br /> 2 ) Asphalt Work Category 2 — Certification and quality control testing by the <br /> Contractor as defined in 334 -6 . 3 <br /> 3 ) Asphalt Work Category 3 — Quality control testing by the Contractor and <br /> acceptance testing by the Engineer as defined in 334 -6 . 4 . <br /> 38 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.