My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 . BID BONDS/ DEPOSITS <br /> Each bid must be accompanied by a Bid Bond or Deposit in a sum of not less than five percent <br /> (5% ) of the total bid . Bid Bonds and deposits amounting to less than one hundred dollars need <br /> not be submitted . All checks should be made payable to the County . If the successful bidder <br /> fails to deliver as indicated in the Special Terms and Conditions , does not conform to <br /> specifications or fails to perform as agreed upon , the County shall be entitled to retain the <br /> deposit to rectify the bidder' s unacceptable performance . The only types of acceptable surety <br /> will be : <br /> 1 . Bid Bond signed by a surety company authorized to do business in the State of <br /> Florida . <br /> 2 . Cashier Check . <br /> 3 . Certified Check drawn on a responsible financial institution . <br /> 4 . U . S . Postal Money Order. <br /> The County reserves the right to hold the bid security of the three ( 3 ) best value bidders until the <br /> contract is properly executed . Bid deposits of other unsuccessful bidders will be returned after <br /> award of the contract. <br /> 20 . PRE -BID SITE INSPECTION AND PRE -BID CONFERENCE <br /> SITE INSPECTION - NONE <br /> PRE- BID CONFERENCE - NONE <br /> 21 . TIME OF COMPLETION AND LIQUIDATED DAMAGES <br /> BASE BID — TIMEFRAME <br /> The work to be performed as part of the BASE BID project timeframe shall commence on the <br /> date of the written notice to proceed given by the County , which is anticipated to be issued on <br /> XXXX XX , 2010 . All work that is to be performed as part of this contract shall be substantially <br /> completed by XXXXX XX , 2010 and totally 100 % completed by XXXX XX, 2010 , with such <br /> extensions of time in calendar days as are provided for in the General Terms and Conditions <br /> outlined below . <br /> If said work is not substantially completed within the specified timeframes listed above , the <br /> contractor shall be liable and hereby agrees to pay the owner as liquidated damages , and not <br /> as a penalty , the sum of $ 388 . 00 dollars per calendar day between the date Substantial <br /> Completion of the work is achieved and the Final 100 % Completion date and or Acceptance by <br /> the County for each and every day or part of a day thereafter that said work remains incomplete . <br /> 57 <br /> 12/29/2009 2:23:44 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.