Laserfiche WebLink
include but not be limited to removal of trash , construction debris , excavated materials and <br /> materials generated as a result of the demolition of the existing sidewalks , curbs and gutters , <br /> road way components . <br /> ( 3 ) The Contractor shall restore all roadways immediately upon the completion of each <br /> segment and or phase of the construction . Such restoration shall be to the satisfaction of the <br /> County . <br /> (4 ) The Contractor shall submit for the County review and approval , as part of his bid <br /> submission , a sample copy of his company' s daily reporting format for reporting the progress of <br /> construction . This format shall include but not be limited to the detailing of all labor , equipment <br /> and materials used in the construction of the project along with the areas worked , type of work <br /> performed , problems encountered and daily weather conditions at the work areas . The <br /> Contractor will be required to submit to the County ' s Project Manager, copies of all daily reports <br /> completed by the Contractor' s personnel and his subcontractors at the beginning of the <br /> following work day for each day worked . <br /> (5 ) The Contractor shall be required to submit (2 ) copies of 8 1 /2"x 11 " progress color <br /> photos indicating the completion of the contract work with the dates that the work was <br /> performed , on a weekly basis to the County ' s Project Manager. The Contractor shall also be <br /> required to submit as- built surveys , by a registered land surveyor licensed to do work in the <br /> State of Florida , on a weekly basis to the County' s Project Manager that indicate the completion <br /> of contract work by the Contractor and his subcontractors . <br /> (6 ) The Contractor shall provide as part of the contract work , adequate sanitary facilities , <br /> within the fenced - in areas of the total project area , for the use of the Contractor' s workmen . <br /> ( 7 ) Street Lighting Systems Pedestrian Lighting Systems Electrical distribution Systems , <br /> The Contractor shall at all times protect and maintain the operation of the existing street lighting <br /> systems , : the existing pedestrian lighting systems and the existing underground electrical <br /> distribution systems within the project area including but not limited to all poles , conduits , wiring , <br /> pull boxes , transformers , switchgear assemblies , meter assemblies , service connection <br /> assemblies and lighting fixtures that are located within the project whether shown or not shown <br /> on the contract drawings . <br /> The Contractor shall protect and maintain all existing landscaping and irrigation systems within <br /> the project area during construction . <br /> (8 ) . The Contractor shall maintain and provide a safe access for vehicles and pedestrians at <br /> all times within the project area . <br /> (9 ) Landscaping and Irrigation Systems - The contractor shall at all times protect and <br /> maintain the existing landscaping and irrigation systems within the project area . <br /> 23 . INSURANCE PROVISIONS <br /> 24 . COMPLIANCE WITH REQUIRED CONTRACT PROVISIONS <br /> Bidders shall cite compliance with the Required Contract Provisions and shall execute and <br /> include the following in their bid proposals : <br /> 59 <br /> 12/29/2009 2:23:44 PM <br />