My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GC 1 DEFINITIONS <br /> ( a ) The " Owner" , the " Contractor" , and the " Engineer" are treated throughout the Contract as <br /> if each were of the singular number and masculine gender. <br /> ( b ) " Engineer" shall be used and shall be understood to mean the professional engineer or <br /> architect consultant retained by the County or the designed staff engineer of the Public Works <br /> Department of the County . <br /> (c) " Subcontractor" includes only those having a direct contract with the Contractor, and it <br /> includes one who furnishes material worked to a special design according to the plans and specifications <br /> of this work but does not include one who merely furnishes material not so worked . <br /> ( d ) The term "work" means the construction services required by the Contract Documents/ <br /> this Agreement and requires all labor, materials and services to be provided by the Contractor to fulfill the <br /> Contractor' s obligations under this Agreement . <br /> GC 2 EXECUTION CORRELATION AND INTENT OF DOCUMENTS : <br /> The Contract Documents shall be executed in two original sets by Owner and Contractor. The Contract <br /> Documents are complementary , and wherever possible the provisions of the documents shall be <br /> construed in such manner as to avoid conflicts between provisions of the various documents . In the <br /> event of any conflict among the Contract Documents , the Documents shall be construed according to the <br /> following priorities : <br /> First Priority : Specifications ( quality) <br /> Second Priority : Drawings ( location ) <br /> Third Priority : Special Terms <br /> Fourth Priority : General Terms and Conditions <br /> Fifth Priority : Contract Documents <br /> Sixth Priority Invitation to Bid <br /> Seventh Priority Contractor' s Bid <br /> In any event of inconsistency , however, the latest , and more stringent , or technical , or the greater quantity <br /> requirements shall control the work to be performed by the Contractor. <br /> GC 3 CONTRACTOR RESPONSIBILITIES <br /> a ) The Contractor shall be held liable to the Owner for the performance of all work provided <br /> for under this Contract. These specifications make no attempt to fix the scope of the work of any <br /> subcontractor nor the responsibilities of the subcontractors . <br /> b) Contractor shall provide all labor, materials , equipment, tools , construction equipment <br /> and machinery , heat , utilities , and other facilities and services necessary for the property <br /> execution and completion of the Work . <br /> C) Contractor shall be solely responsible for all construction means , methods , techniques , <br /> sequences , procedures and safety programs in connection with the performance of the work . <br /> Contractor shall be solely responsible for the engagement and management of any <br /> subcontractors used to perform any portion of the work . <br /> d ) The Contractor shall be liable to the Owner for materials furnished . This shall include all <br /> materials whether manufactured and/or fabricated by other persons . In the event that an agent or <br /> other representative of the Owner approved the installation or erection of any item of material and <br /> the Contractor feels the same is not fabricated in good workmanlike manner, he shall forthwith <br /> advise the Engineer and the Owner thereof in writing . <br /> e ) The Contractor shall provide for each of the following activities : <br /> ( 1 ) Maintain a log of daily activities , including manpower records , weather , delays , major <br /> 30 <br /> 12/1 /2009 3:45:46 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.