My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e ) The Contractor shall keep at the work site one ( 1 ) copy of all permitted drawings and <br /> specifications kept current with all changes and modifications and shall at all times give the Owner, the <br /> Engineer and all trades performing at the project , access thereto . <br /> GC 6 MATERIALS , LABOR EQUIPMENT . <br /> Unless otherwise stipulated , the Contractor shall provide and pay for all materials , labor, tools , <br /> equipment , services , transportation and other facilities necessary for the execution and completion of the <br /> work . Unless otherwise specified , all materials incorporated in the permanent work shall be new and both <br /> workmanship and materials shall be of good quality . The Contractor shall , if required , furnish satisfactory <br /> evidence as to the kind and quality of materials . <br /> GC 7 QUALITY ASSURANCE <br /> Contractor shall develop , implement and maintain a plan for the work which quality assurance <br /> and management and control of the construction services . Contractor shall maintain an adequate <br /> inspection system and perform such inspections as will assure that the work performed conforms to the <br /> requirement of the Contract Documents . <br /> GC 7 PERMITS AND FEES . <br /> All Permits or licenses necessary for the performance of the work or required by law or ordinance , <br /> including Building permits , shall be secured , maintained , and paid for by the Contractor, unless otherwise <br /> provided in the Special Terms . Contractor shall be responsible for all governmental fees , including but <br /> not limited to utility fees and connection fees . Owner shall be responsible for obtaining any necessary <br /> easements . For construction of a building , Owner shall be responsible for all County Construction <br /> Services plan and permit review fees <br /> GC 8 PROJECT MANAGER . <br /> The Contractor shall keep during the term of this Agreement a competent Project Manager and <br /> any necessary assistants , all satisfactory to the Engineer and Owner. The Contractor shall advise the <br /> Engineer, in writing , within ten ( 10 ) days after the date of Owner' s issuance of a Notice to Proceed , the <br /> name and local address of the Project Manager who will be in charge of the project , together with amount <br /> of his authority to represent the Contractor, along with the Project Manager' s cell phone number. The <br /> Owner and Engineer shall be able to reach the Project Manager at his cell phone number at all working <br /> hours . The Project Manager shall represent the Contractor in his absence and all directions given to him <br /> shall be binding as if given to the Contractor. Important directions shall be confirmed on written request in <br /> each case . The Contractor shall give sufficient superintendence to the work using his best skill and <br /> attention . If the Contractor, in the course of the work finds any discrepancy between the plans and the <br /> physical conditions of the locality , or any errors or omissions in plans or in the layout as given by survey <br /> points and instructions , he shall immediately inform the Engineer and the Owner, in writing , and <br /> the <br /> Engineer will promptly verify the same . Any work done after such discovery , until authorized , will be done <br /> at the Contractor' s risk. Neither party shall employ or hire any employee of the other party without his <br /> consent. At any time Owner may request and Contractor shall replace the individual performing as <br /> Project Manager with an individual acceptable to Owner. <br /> GC 9 SUBCONTRACTORS AND SUPPLIERS . <br /> a) Within ten ( 10 ) days after the date of the Owner' s issuance of a Notice to Proceed , the <br /> Contractor shall furnish to the Owner in writing the names of the persons or entities ( including those who <br /> are to furnish materials or equipment fabricated to a special design ) whom the Contractor will engage as <br /> sub-contractors or suppliers for the Project. The Contractor shall not contract with a proposed person or <br /> entity to whom the Owner has made reasonable and timely objection in writing . The Contractor <br /> understands and agrees that the Contractor alone is responsible to the Owner for all of the work under <br /> the Contract and that any review of Subcontractors , Sub-subcontractors or suppliers by the Owner or <br /> Engineer will not in any way make the Owner responsible to any Subcontractor or Sub-subcontractor or <br /> suppliers , nor will it make the Owner responsible for the actions or omissions of any Subcontractor or <br /> Sub-subcontractor or suppliers . <br /> b ) By appropriate written agreement , the Contractor shall require each Subcontractor, to the <br /> 32 <br /> 12/1 /2009 3:45:46 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.