Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provide the following information within seven ( 7 ) days of commencement of the delay . Contractor <br /> acknowledges that the evaluation of time extensions will be based on the following information : <br /> 1 . All schedule updates , submittals and other conditions of the Contract have been <br /> met ; <br /> 2 . The delay is beyond the control of the Contractor and subcontractors and due to <br /> no direct or indirect fault of the Contractor. <br /> 3 . Nature of the delay . <br /> 4 . Dates of commencement / and end of delay . <br /> 5 . Evidence that the delayed work results in a direct delay to the schedule critical <br /> path . <br /> 6 . List of tasks/work affected by the delay . <br /> 7 . Anticipated extent of delay . <br /> 8 . Recommended action to minimize delay . <br /> 9 . The Contractor has used all the float time available for the work involved in the <br /> delay request. <br /> Time extensions for weather delays will only be considered if all float time is exhausted prior to <br /> the <br /> weather occurrence . Failure of Contractor to timely request a time extension constitutes a waiver by <br /> Contractor and a denial of a time extension . <br /> If the Contractor is delayed at any time in the progress of the work by any act or neglect of the Owner, or <br /> if any employee of the Owner or by any separate Contractor employed by the Owner or by any changes <br /> ordered in the work , by labor disputes , fire , or unusual delay in transportation , unavoidable casualties or <br /> any causes beyond the Contractor' s control or by delay authorized by the Owner pending resolution of <br /> disputes , and such delay extends the Project completion date , Substantial Completion shall be extended <br /> by Change Order for such reasonable time as the Owner may determine . <br /> GC 43 NO DAMAGES FOR DELAY ; EXCLUSIVE REMEDY . <br /> The Contractor expressly agrees that a change order for an extension of the project completion <br /> date and substantial completion date constitutes its sole and exclusive remedies for efficiency or other <br /> related time or impact- based claims ( hereinafter collectively "delay" ) or for delay attributable to any <br /> foreseen or unforeseen condition , or for delays claimed to be the result of active , intentional , knowing or <br /> passive interference by the Owner, Engineer, or agents of either, and waives claims for any and all <br /> damages which it may suffer by reason of such claims , including but not limited to , lost profits , loss <br /> or <br /> impairment of bonding capacity , destruction of business , overhead , supervision , extended unabsorbed <br /> home office overhead , increase insurance costs , lost profits on alternate or unperformed contracts . <br /> Contractor hereby affirms that an extension of time is the Contractor' s sole and exclusive remedy . Apart <br /> from extension of time , no payment of claim for damages shall be made to the Contractor as <br /> compensation for damages for any delays in the work , whether such delay be avoidable or unavoidable . <br /> GC 44 PAYMENT PROCEDURE . <br /> GC 44 . 1 Contractor' s invoices shall reference the bid number. Submittals of estimates <br /> and invoices for payment must be directed to : Indian River County — Accounts Payable , The <br /> County will not be responsible for any delay in payment at the County if Contractor submits his <br /> estimate and invoice to any other address . <br /> GC 44 . 2 Initial Payment. Prior to submittal of its initial payment request , Contractor shall <br /> have submitted the following items to the Engineer: <br /> 1 . List of Subcontractors and suppliers <br /> 2 . Project schedule <br /> 3 . Schedule of values <br /> 4 . All current certificates of insurance <br /> 5 . Designation of Contractor' s Project Manager <br /> 42 <br /> 12/1 /2009 3:45:46 PM <br />