My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. The falsification of any of the above certifications may subject the Contractor to civil or criminal <br /> prosecution under 18 U . S . C . 1. 001 and 31 U . S . C . 231 . <br /> g . The Contractor or subcontractor shall make the records required under paragraph 2b of this <br /> Section V available for inspection , copying, or transcription by authorized representatives of the SHA , the <br /> FHWA , or the DOL , and shall pen-nit such representatives to interview employees during working hours <br /> on the job . If the Contractor or subcontractor fails to submit the required records or to make them <br /> available, the SHA , the FHWA , the DOL, or all may, after written notice to the Contractor, sponsor, <br /> applicant, or owner, take such actions as may be necessary to cause the suspension of any further payment, <br /> advance , or guarantee of funds . Furthermore , failure to submit the required records upon request or to <br /> make such records available may be grounds for debarment action pursuant to 29 CFR 5 . 1. 2 . <br /> VI . RECORD OF MATERIALS , SUPPLIES , AND LABOR <br /> 1 . On all Federal-aid Contracts on the National Highway System, except those which provide <br /> solely for the installation of protective devices at railroad grade crossings , those which are constricted on a <br /> force account or direct labor basis , highway beautification Contracts , and Contracts for which the total <br /> final construction cost for roadway and bridge is less than $ 1 ,000 , 000 (23 CFR 635 ) the Contractor shall : <br /> a. Become familiar with the list of specific materials and supplies contained in Forn <br /> FHWA -47 , " Statement of Materials and Labor Used by Contractor of Highway Construction Involving <br /> Federal Funds , " prior to the commencement of work under this Contract. <br /> b . Maintain a record of the total cost of all materials and supplies purchased for and <br /> incorporated in the work, and also of the quantities of those specific materials and supplies listed on Form <br /> FHWA-47 , and in the units shown on Form FHWA-47 . <br /> c . Furnish, upon the completion of the Contract, to the SHA resident engineer on Form <br /> FHWA-47 together with the data required in paragraph lb relative to materials and supplies, a final labor <br /> summary of all contract work indicating the total hours worked and the total amount earned . <br /> 2 . At the Prime Contractor ' s option, either a single report covering all Contract work or separate <br /> reports for the Contractor and for each subcontract shall be submitted. <br /> VII . SUBLETTING OR ASSIGNING THE CONTRACT <br /> 1 . The Contractor shall perform with its own organization Contract work amounting to not less <br /> than 30 percent (or a greater percentage if specified elsewhere in the Contract) of the total original Contract <br /> price , excluding any specialty items designated by the State . Specialty items may be performed by <br /> subcontract and the amount of any such specialty items performed may be deducted from the total original <br /> Contract price before computing the amount of work required to be performed by the Contractor ' s own <br /> organization (23 CFR 635 ) . <br /> a. "Its own organization" shall be construed to include only workers employed and paid <br /> directly by the Prime Contractor and equipment owned or rented by the Prime Contractor, with or without <br /> operators . Such term does not include employees or equipment of a subcontractor, assignee , or agent of the <br /> Prime Contractor. <br /> b . " Specialty Items" shall be construed to be limited to work that requires highly <br /> specialized knowledge , abilities , or equipment not ordinarily available in the type of Contracting <br /> organizations qualified and expected to bid on the Contract as a whole and in general are to be limited to <br /> minor components of the overall Contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.