My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-083
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:54:13 AM
Creation date
10/1/2015 6:08:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/10/2014
Control Number
2014-083
Agenda Item Number
8.G.
Entity Name
Melvin Bush Construction
Subject
Work Authorization Directive No. 2014-001
Water and Sewer Main
Area
North of 21st St.SE Young's Market
Project Number
UCP 4096
Supplemental fields
SmeadsoftID
13320
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br />LABOR <br />US 1 South <br />Replacement <br />from 21st <br />10" PVC <br />Project : Young's <br />Date: June 2, 2014 <br />Force <br />Market <br />Indian River County <br />AND MATERIALS COST ESTIMATE FROM <br />LABOR CONTRACTOR: MELVIN <br />12" HDPE Directional Bore <br />of Existing 10" AC Water Main <br />Street SE 1000' to the North and <br />Main Replacement n/o <br />Department <br />LABOR <br />BUSH <br />of Utilities <br />CONTRACTOR'S BID ITEM LIST <br />CONSTRUCTION, INC. <br />MELVIN BUSH LABOR COST <br />MATERIALS <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Labor Unit <br />Price <br />Total Labor <br />Price <br />Material Unit <br />Price <br />Total Material <br />Price <br />71 <br />Mobilization, <br />Demobilization, MOT <br />10% <br />% <br />0.10 <br />$8,425.00 <br />Olc <br />Install 6" PVC <br />Water Main <br />100 <br />LF <br />6.00 <br />$600.00 <br />4.00 <br />$400.00 <br />Old <br />Install 8" PVC <br />Water Main <br />100 <br />LF <br />7.00 <br />$700.00 <br />7.00 <br />$700.00 <br />Olf <br />Install 12" PVC <br />Water Main <br />100 <br />LF <br />$9.00 <br />$900.00 <br />$15.00 <br />$1,500.00 <br />05e <br />Install <br />Pipe <br />Replacement) <br />and <br />12" <br />MJ <br />HDPE <br />Adapters <br />Directional <br />(Water <br />Bore <br />Main <br />Including <br />and <br />Force <br />Fusion of <br />Main <br />1,350 <br />LF <br />$41.00 <br />$55,350.00 <br />$17.00 <br />$22,950.00 <br />17b <br />Install 6" Gate <br />Valve <br />1 <br />EA <br />$125.00 <br />$125.00 <br />$450.00 <br />$450.00 <br />17c <br />Install 8" Gate <br />Valve <br />1 <br />EA <br />$160.00 <br />$160.00 <br />$750.00 <br />$750.00 <br />17d <br />Install 10" <br />GV&B <br />1 <br />EA <br />$175.00 <br />$175.00 <br />$950.00 <br />$950.00 <br />17e <br />Install 12" <br />GV&B <br />2 <br />EA. <br />$250.00 <br />$500.00 <br />$1,200.00 <br />$2,400.00 <br />19b <br />Install 2" ARV, <br />Directional <br />Bore <br />GV, Manhole structure and cover on <br />Water Main <br />2 <br />EA <br />$700.00 <br />$1,400.00 <br />$3,500.00 <br />$7,000.00 <br />19Directional <br />Install <br />4" ARV, <br />GV, Manhole <br />Bore Force <br />Main <br />structure and <br />cover on <br />2 <br />EA <br />$1 000.00 <br />$2,000.00 <br />$4,500.00 <br />$9,000.00 <br />29f <br />Install 10" PVC <br />Force Main <br />100 <br />LF <br />$9.00 <br />$900.00 <br />$11.00 <br />$1 100.00 <br />I lb <br />Grout Pipe <br />12" <br />Abandoned <br />and Left in Place, 10" through <br />1,300 <br />LF <br />$8.00 <br />$10,400.00 <br />$0.00 <br />07 <br />Install Mechanical <br />Restrained Joint DI Fittings <br />2.00 <br />TON <br />$3,500.00 <br />$7,000.00 <br />$3,500.00 <br />$7 000.00 <br />21 <br />Test Holes <br />/ <br />Potholes <br />20 <br />EA <br />$200.00 <br />$4,000.00 <br />$0.00 <br />64a <br />Lawn Restoration <br />(Topsoil and Sod) <br />100.0 <br />LF <br />$0.40 <br />$40.00 <br />$2.50 <br />$250.00 <br />Subtotal Water <br />System <br />$84,250.00 <br />$54,450.00 <br />SubtotalMaterials, <br />Subtotal <br />Water <br />& <br />System <br />Permitting <br />Labor, <br />Mob., <br />Demob., <br />MO <br />f, <br />$92,675.00 <br />Public <br />$100,000.00) <br />Construction <br />Bond <br />Allowance <br />(labor <br />cost <br />over <br />1 <br />0 <br />0.04 <br />$3,707.00 <br />Force Accnt. <br />IRCDUS Contingency <br />Account <br />1 <br />% <br />0.10 <br />$9,267.50 <br />$5,445.00 <br />II <br />TOTALS <br />$105,649.50 <br />559,895.00 <br />LABOR TOTAL <br />ROUNDED <br />$106,000.00 <br />MAT. TOTAL RC <br />$60,000.00 <br />11 <br />TOTAL ROUNDED <br />$166,000.00 <br />ATTACHMENT 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.