Laserfiche WebLink
ATTACHMENT 1 <br />LABOR <br />US 1 South <br />Replacement <br />from 21st <br />10" PVC <br />Project : Young's <br />Date: June 2, 2014 <br />Force <br />Market <br />Indian River County <br />AND MATERIALS COST ESTIMATE FROM <br />LABOR CONTRACTOR: MELVIN <br />12" HDPE Directional Bore <br />of Existing 10" AC Water Main <br />Street SE 1000' to the North and <br />Main Replacement n/o <br />Department <br />LABOR <br />BUSH <br />of Utilities <br />CONTRACTOR'S BID ITEM LIST <br />CONSTRUCTION, INC. <br />MELVIN BUSH LABOR COST <br />MATERIALS <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Labor Unit <br />Price <br />Total Labor <br />Price <br />Material Unit <br />Price <br />Total Material <br />Price <br />71 <br />Mobilization, <br />Demobilization, MOT <br />10% <br />% <br />0.10 <br />$8,425.00 <br />Olc <br />Install 6" PVC <br />Water Main <br />100 <br />LF <br />6.00 <br />$600.00 <br />4.00 <br />$400.00 <br />Old <br />Install 8" PVC <br />Water Main <br />100 <br />LF <br />7.00 <br />$700.00 <br />7.00 <br />$700.00 <br />Olf <br />Install 12" PVC <br />Water Main <br />100 <br />LF <br />$9.00 <br />$900.00 <br />$15.00 <br />$1,500.00 <br />05e <br />Install <br />Pipe <br />Replacement) <br />and <br />12" <br />MJ <br />HDPE <br />Adapters <br />Directional <br />(Water <br />Bore <br />Main <br />Including <br />and <br />Force <br />Fusion of <br />Main <br />1,350 <br />LF <br />$41.00 <br />$55,350.00 <br />$17.00 <br />$22,950.00 <br />17b <br />Install 6" Gate <br />Valve <br />1 <br />EA <br />$125.00 <br />$125.00 <br />$450.00 <br />$450.00 <br />17c <br />Install 8" Gate <br />Valve <br />1 <br />EA <br />$160.00 <br />$160.00 <br />$750.00 <br />$750.00 <br />17d <br />Install 10" <br />GV&B <br />1 <br />EA <br />$175.00 <br />$175.00 <br />$950.00 <br />$950.00 <br />17e <br />Install 12" <br />GV&B <br />2 <br />EA. <br />$250.00 <br />$500.00 <br />$1,200.00 <br />$2,400.00 <br />19b <br />Install 2" ARV, <br />Directional <br />Bore <br />GV, Manhole structure and cover on <br />Water Main <br />2 <br />EA <br />$700.00 <br />$1,400.00 <br />$3,500.00 <br />$7,000.00 <br />19Directional <br />Install <br />4" ARV, <br />GV, Manhole <br />Bore Force <br />Main <br />structure and <br />cover on <br />2 <br />EA <br />$1 000.00 <br />$2,000.00 <br />$4,500.00 <br />$9,000.00 <br />29f <br />Install 10" PVC <br />Force Main <br />100 <br />LF <br />$9.00 <br />$900.00 <br />$11.00 <br />$1 100.00 <br />I lb <br />Grout Pipe <br />12" <br />Abandoned <br />and Left in Place, 10" through <br />1,300 <br />LF <br />$8.00 <br />$10,400.00 <br />$0.00 <br />07 <br />Install Mechanical <br />Restrained Joint DI Fittings <br />2.00 <br />TON <br />$3,500.00 <br />$7,000.00 <br />$3,500.00 <br />$7 000.00 <br />21 <br />Test Holes <br />/ <br />Potholes <br />20 <br />EA <br />$200.00 <br />$4,000.00 <br />$0.00 <br />64a <br />Lawn Restoration <br />(Topsoil and Sod) <br />100.0 <br />LF <br />$0.40 <br />$40.00 <br />$2.50 <br />$250.00 <br />Subtotal Water <br />System <br />$84,250.00 <br />$54,450.00 <br />SubtotalMaterials, <br />Subtotal <br />Water <br />& <br />System <br />Permitting <br />Labor, <br />Mob., <br />Demob., <br />MO <br />f, <br />$92,675.00 <br />Public <br />$100,000.00) <br />Construction <br />Bond <br />Allowance <br />(labor <br />cost <br />over <br />1 <br />0 <br />0.04 <br />$3,707.00 <br />Force Accnt. <br />IRCDUS Contingency <br />Account <br />1 <br />% <br />0.10 <br />$9,267.50 <br />$5,445.00 <br />II <br />TOTALS <br />$105,649.50 <br />559,895.00 <br />LABOR TOTAL <br />ROUNDED <br />$106,000.00 <br />MAT. TOTAL RC <br />$60,000.00 <br />11 <br />TOTAL ROUNDED <br />$166,000.00 <br />ATTACHMENT 1 <br />