WORK AUTHORIZATION DIRECTIVE <br />No. 2014-001 <br />IRC — REPLACE 10" AC WM NORTH OF 21STREET SE TO YOUNG'S MARKETAND 10" <br />PVC FORCE MAIN NORTH OF YOUNG'S MARKET WITH 12" HDPE DIR. BORES <br />DATE OF ISSUANCE: June 2014 EFFECTIVE DATE: June 2014 <br />OWNER: Indian River County <br />CONTRACTOR: Melvin Bush Construction, Inc. <br />CONTRACT: WATER SEWER AND RECLAIM WAl ER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CON I RAC h BID NO. 2010052 AWARDED <br />September 7, 2010, extended Oct. 1. 2012 to Sept 30, 2013 <br />PROJECT: Construct 1350' 12" HDPE Dir. Bores from 21' St. SE North to replace 10" AC water main, <br />Install two 12" Gate Valves, Install 200' of 12" HDPI. n/o Young's Market to replace 10" PVC force <br />main to resolve conflicts with new entrance drive to strmcenter on east side US 1 at Highland Drive, <br />Install two ARV's. <br />COUNTY UTILITY PROJECT NO.: UCP #4096 <br />COUNTY WIP. No. 471-23536-044699-13502 <br />CONTRACTOR'S PROJECT NO.: N/A <br />You are directed to proceed promptly with the following Naork: <br />Description: Replace the 10" AC water main from 21' Street SE to north of Young's Market, reconnect Young's <br />Market to new main after testing and chlorination. replace about 200 feet of 10" PVC force main north of Young's <br />Market in conflict with a proposed driveway and install two ARVs, ons on each side of the directional bore. <br />Purpose of Work Authorization Directive: The construction will remove an active 10" AC water main from under the <br />proposed pavement of US 1 requested by the FDOI' and relocate a section of 10" PVC water main in conflict with a <br />proposed driveway. <br />Attachments: (List documents supporting work) <br />Method of determining Contract Price: <br />Unit Prices: Bid Items as established pursuant to Bid No. 2010052, and awarded by the Board of County <br />Commissioners on September 7 2010 to Melvin Bush Construction. Inc., extended to Sept. 30, 2014. <br />Lump Sum <br />Cost of the Work <br />12 <br />■ <br />■ <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Estimated Labor Cost (rounded) _ <br />$106,000.00 <br />Estimated Contract Time. <br />30 days <br />Estimated Labor Cost (rounded) <br />ACCEPTED: <br />By: <br />• <br />J <br />elvin Bush Constr., Inc., <br />Labor Contractor <br />$106,000.00 <br />REC0IMMENDED: <br />By(cfr( C24 <br />Gordon E. tips P.E. <br />Environmental I ngIn e$ntSSI0�yF9s•.01 <br />Date: 6 - a y Date: <br />F:\users\mary\Downloads\A3 - Work Authorization No. 2014-001 <br />l <br />AP' '0 ED <br />By <br />Jo <br />COUNTY CHAIR ASN <br />Peter D O'Bryan <br />Date: Mune 10, 2014 <br />Attachment 2 <br />