My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-083
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:54:13 AM
Creation date
10/1/2015 6:08:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/10/2014
Control Number
2014-083
Agenda Item Number
8.G.
Entity Name
Melvin Bush Construction
Subject
Work Authorization Directive No. 2014-001
Water and Sewer Main
Area
North of 21st St.SE Young's Market
Project Number
UCP 4096
Supplemental fields
SmeadsoftID
13320
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />No. 2014-001 <br />IRC — REPLACE 10" AC WM NORTH OF 21STREET SE TO YOUNG'S MARKETAND 10" <br />PVC FORCE MAIN NORTH OF YOUNG'S MARKET WITH 12" HDPE DIR. BORES <br />DATE OF ISSUANCE: June 2014 EFFECTIVE DATE: June 2014 <br />OWNER: Indian River County <br />CONTRACTOR: Melvin Bush Construction, Inc. <br />CONTRACT: WATER SEWER AND RECLAIM WAl ER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CON I RAC h BID NO. 2010052 AWARDED <br />September 7, 2010, extended Oct. 1. 2012 to Sept 30, 2013 <br />PROJECT: Construct 1350' 12" HDPE Dir. Bores from 21' St. SE North to replace 10" AC water main, <br />Install two 12" Gate Valves, Install 200' of 12" HDPI. n/o Young's Market to replace 10" PVC force <br />main to resolve conflicts with new entrance drive to strmcenter on east side US 1 at Highland Drive, <br />Install two ARV's. <br />COUNTY UTILITY PROJECT NO.: UCP #4096 <br />COUNTY WIP. No. 471-23536-044699-13502 <br />CONTRACTOR'S PROJECT NO.: N/A <br />You are directed to proceed promptly with the following Naork: <br />Description: Replace the 10" AC water main from 21' Street SE to north of Young's Market, reconnect Young's <br />Market to new main after testing and chlorination. replace about 200 feet of 10" PVC force main north of Young's <br />Market in conflict with a proposed driveway and install two ARVs, ons on each side of the directional bore. <br />Purpose of Work Authorization Directive: The construction will remove an active 10" AC water main from under the <br />proposed pavement of US 1 requested by the FDOI' and relocate a section of 10" PVC water main in conflict with a <br />proposed driveway. <br />Attachments: (List documents supporting work) <br />Method of determining Contract Price: <br />Unit Prices: Bid Items as established pursuant to Bid No. 2010052, and awarded by the Board of County <br />Commissioners on September 7 2010 to Melvin Bush Construction. Inc., extended to Sept. 30, 2014. <br />Lump Sum <br />Cost of the Work <br />12 <br />■ <br />■ <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Estimated Labor Cost (rounded) _ <br />$106,000.00 <br />Estimated Contract Time. <br />30 days <br />Estimated Labor Cost (rounded) <br />ACCEPTED: <br />By: <br />• <br />J <br />elvin Bush Constr., Inc., <br />Labor Contractor <br />$106,000.00 <br />REC0IMMENDED: <br />By(cfr( C24 <br />Gordon E. tips P.E. <br />Environmental I ngIn e$ntSSI0�yF9s•.01 <br />Date: 6 - a y Date: <br />F:\users\mary\Downloads\A3 - Work Authorization No. 2014-001 <br />l <br />AP' '0 ED <br />By <br />Jo <br />COUNTY CHAIR ASN <br />Peter D O'Bryan <br />Date: Mune 10, 2014 <br />Attachment 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.