My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-084B
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-084B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:54:37 AM
Creation date
10/1/2015 6:10:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/10/2014
Control Number
2014-084B
Agenda Item Number
8.I.
Entity Name
NEC Corporation of America
Subject
Library Statement of Work SV8300
Supplemental fields
SmeadsoftID
13423
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEC NEC Corporation of America <br />supplies, (e) fire, flood, wind, lightning or other similar acts of God, (f) failure of Client to <br />maintain proper environmental conditions for the Equipment (g) improper wiring, <br />installation, repair, or alteration of the software or hardware by anyone other than NEC or <br />its agents (h) software changes or attempted changes in the Equipment by persons not <br />authorized by NEC (i) database reprogramming required because of Client error of any <br />kind 0) failure of rotation media not furnished by NEC (k) operation of the Equipment with <br />other third party products not in accordance with the Equipment manufacturer's <br />specifications (I) failures or other problems caused by products for which NEC is not <br />otherwise contractually responsible or (n) Equipment failures due to causes other than <br />ordinary use. <br />7.9 Any hardware upgrades, not specifically included in this SOW, but required to run new or <br />updated Software. <br />8. CHANGE MANAGEMENT PROCEDURES <br />1t may be necessary to amend this SOW for reasons including, but not limited to, the following: <br />8.1 Client's proposed changes to the scope of the Project or proposed changes to the <br />specifications for the Services or other Deliverables. <br />8.2 Client's proposed changes to the Project plan or Project schedule, <br />8.3 Unavailability of resources which are beyond either party's control; or, <br />8.4 Environmental or architectural conditions not previously identified. <br />In the event either party desires to change this SOW, the following procedures will apply: <br />8.5 The party requesting the change will deliver a "Change Request" (Schedule B) to the <br />other party. The Change Request will describe the nature of the proposed change; the <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.