My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-245
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 10:59:19 AM
Creation date
10/1/2015 5:46:06 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/03/2013
Control Number
2013-245
Agenda Item Number
15.B.1
Entity Name
Neel-Schaffer Inc.
Subject
Work Order No.1 2104 Solid Waste Management Plan
Alternate Name
SWDD
Supplemental fields
SmeadsoftID
12656
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work for Solid Waste Management Master Plan Update 1 11/ 1/ 2013 1 Page 3 of 5 <br /> Subtask 2 . 3 — Conduct Sorting Event <br /> • Obtain the necessary equipment for conducting the sorting event . KCI will provide a scale, <br /> customized sorting table, all sorting equipment and tools, safety equipment, protective gear, <br /> and fluids to keep workers hydrated . The County will be asked to provide the following : <br /> o A 20' x 20' tent ( or other covered area ) to protect workers from the elements while <br /> sorting. <br /> o A bobcat ( or small loader) and operator for pulling samples . <br /> o Roll -off containers and transport for sorted and unsorted garbage if the sorting event <br /> does not take place near the working face of the landfill . <br /> • Provide a Study Supervisor and Sampling Supervisor, as well as day laborers to assist with the <br /> sorting activities . If the County prefers to provide the day laborers, the budget will be adjusted <br /> accordingly. <br /> • Conduct the sorting event . The sorting event will be performed during the winter months to <br /> account for seasonal residents, as approved by the County. Specific work hours will depend on <br /> the facility' s operating hours and typical waste delivery patterns . Representative samples of at <br /> least 200 pounds will be pulled from each selected load of waste . The samples will be sorted <br /> into the material categories identified in Subtask 2 . 2 and weighed . KCI will conduct a training <br /> meeting, prior to starting work each day, to review safety and sorting procedures with workers . <br /> Subtask 2 .4 — Analyze Study Data and Prepare Final Report <br /> • Analyze the data to calculate the percent by weight of each material category for each <br /> generator sector. The data for all generator sectors will then be combined based on the relative <br /> tonnages each contribute to the waste stream to calculate the overall composition of solid <br /> waste disposed at the landfill . <br /> • Review the County' s most recent annual solid waste report to FDEP and recent data regarding <br /> the quantities and types of County solid waste, yard waste, and recyclable materials received at <br /> County facilities and other facilities . <br /> • Incorporate this data , as well as results of the Recyclables Composition Study performed by KCI <br /> in October 2013, into the WCS results . This will provide the County not only with the <br /> composition of waste disposed at its facility, but also a broader understanding of the make-up of <br /> waste generated within the County. <br /> • Prepare a draft WCS report. <br /> • Review the draft report with County staff and Consultant and discuss possible implications to <br /> the County' s solid waste management program . <br /> • Revise and finalize the WCS report . <br /> Task 3 : Collection Analysis (Task 6 of Work Order No . 1 ) <br /> The County' s existing collection agreements with Waste Management and Republic expire in 2015 . The <br /> purpose of this task is to review the County' s existing contracts and services and to provide <br /> recommendations regarding opportunities for improvements . <br /> • Review the County's existing collection agreements . <br /> • Update, as appropriate, the previously prepared comparative analysis of the County' s service <br /> level and collection fees with those in other comparable or neighboring Florida jurisdictions . <br /> kessler consulting inc. <br /> innovative waste solutions <br /> li , ' '� JJ Plarwing ? 111 Undian River Co '� , ope SLI 1 L011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.