Laserfiche WebLink
ARTICLE 6 - CONTRACTOR ' S RESPONSIBILITIES 6 . 03 Services, Materials, and Equipment <br /> A. Unless otherwise specified in the General Re- <br /> 6 . 01 Supervision and Superintendence quirements , CONTRACTOR shall provide and <br /> assume full responsibility for all services , materials , <br /> A. CONTRACTOR shall supervise , inspect, and equipment, labor , transportation , construction <br /> direct the Work competently and efficiently , devoting equipment and machinery , tools , appliances , fuel , <br /> such attention thereto and applying such skills and power, light, heat, telephone , water, sanitary <br /> facilities , <br /> expertise as may be necessary to perform the Work in temporary facilities , and all other facilities and <br /> accordance with the Contract Documents . CON - incidentals necessary for the performance , testing , <br /> TRACTOR shall be solely responsible for the means , start-up , and completion of the Work . <br /> methods , techniques , sequences , and procedures of <br /> construction , but CONTRACTOR shall not be B . All materials and equipment incorporated into <br /> responsible for the negligence of OWNER or the Work shall be as specified or, if not specified , shall <br /> ENGINEER in the design or specification of a specific be of good quality and new, except as otherwise <br /> means , method , technique , sequence , or procedure of provided in the Contract Documents . All warranties <br /> construction which is shown or indicated in and and guarantees specifically called for by the Specifica- <br /> expressly required by the Contract Documents. CON - tions shall expressly run to the benefit of OWNER . If <br /> TRACTOR shall be responsible to see that the required by ENGINEER , CONTRACTOR shall furnish <br /> completed Work complies accurately with the Contract satisfactory evidence ( including reports of required <br /> Documents . tests) as to the source, kind , and quality of materials <br /> and equipment. All materials and equipment shall be <br /> B . At all times during the progress of the Work , stored , applied , installed , connected , erected , <br /> CONTRACTOR shall assign a competent resident protected , used , cleaned , and conditioned in <br /> superintendent thereto who shall not be replaced accordance with instructions of the applicable <br /> without written notice to OWNER and ENGINEER Supplier, except as otherwise may be provided in the <br /> except under extraordinary circumstances . The Contract Documents , <br /> superintendent will be CONTRACTOR' s <br /> representative at the Site and shall have authority to 6 . 04 Progress Schedule <br /> act on behalf of CONTRACTOR . All communications <br /> given to or received from the superintendent shall be A. CONTRACTOR shall adhere to the progress <br /> binding on CONTRACTOR . schedule established in accordance with paragraph <br /> 2 . 07 as it may be adjusted from time to time as <br /> 6 . 02 Labor; Working Hours provided below. <br /> A. CONTRACTOR shall provide competent, 1 . CONTRACTOR shall submit to <br /> suitably qualified personnel to survey, lay out, and ENGINEER for acceptance (to the extent indi- <br /> construct the Work as required by the Contract Docu- cated in paragraph 2 . 07 ) proposed adjustments <br /> ments . CONTRACTOR shall at all times maintain in the progress schedule that will not result <br /> in <br /> good discipline and order at the Site. changing the Contract Times (or Milestones) . <br /> Such adjustments will conform generally to the <br /> B . Except as otherwise required for the safety or progress schedule then in effect and additional- <br /> protection of persons or the Work or property at the ly will comply with any provisions of the General <br /> Site or adjacent thereto , and except as otherwise Requirements applicable thereto , <br /> stated in the Contract Documents , all Work at the Site <br /> shall be performed during regular working hours , and 2 . Proposed adjustments in the <br /> CONTRACTOR will not permit overtime work or the progress schedule that will change the Contract <br /> performance of Work on Saturday , Sunday, or any Times (or Milestones) shall be submitted in <br /> legal holiday without OWNER ' s written consent (which accordance with the requirements of Article 12 . <br /> will not be unreasonably withheld ) given after prior Such adjustments may only be made by a <br /> written notice to ENGINEER . Change Order or Written Amendment in accor- <br /> dance with Article 12 . <br /> 6 . 05 Substitutes and "Or-Equals " <br /> 00700 - General Conditions REV 5-10- 13. doc <br /> 00700 - 19 <br /> F1Public Works\ENGINEERING DIVISION PROJECTS\1 341 -Historic Dodgertown (tka VB Sports Village) Room Renovations)VAdmin\bid documents\Master Contract Docs\Master <br /> Contract <br /> Documents\00700 - General Conditions REV 5- 10-13. doc <br />