Laserfiche WebLink
A. Whenever an item of material or equipment is material or equipment proposed is <br /> specified or described in the Contract Documents by essentially equivalent to that named and an <br /> using the name of a proprietary item or the name of a acceptable substitute therefor. Requests for <br /> particular Supplier, the specification or description is review of proposed substitute items of <br /> intended to establish the type , function , appearance , material or equipment will not be accepted <br /> and quality required . Unless the specification or by ENGINEER from anyone other than <br /> description contains or is followed by words reading CONTRACTOR , <br /> that no like , equivalent, or " or-equal " item or no <br /> substitution is permitted , other items of material or c . The procedure for review by ENGI . <br /> equipment or material or equipment of other Suppliers NEER will be as set forth in paragraph <br /> may be submitted to ENGINEER for review under the 6 . 05 . A . 2 . d , as supplemented in the General <br /> circumstances described below. Requirements and as ENGINEER may <br /> decide is appropriate under the <br /> 1 . "Or-Equal" Items: If in ENGINEER' s circumstances, <br /> sole discretion an item of material or equipment <br /> proposed by CONTRACTOR is functionally d . CONTRACTOR shall first make <br /> equal to that named and sufficiently similar so written application to ENGINEER for review <br /> that no change in related Work will be required , of a proposed substitute item of material or <br /> it may be considered by ENGINEER as an equipment that CONTRACTOR seeks to <br /> "or-equal " item , in which case review and furnish or use . The application shall certify <br /> approval of the proposed item may, in that the proposed substitute item will <br /> ENGINEER's sole discretion , be accomplished perform adequately the functions and <br /> without compliance with some or all of the achieve the results called for by the general <br /> requirements for approval of proposed substk design , be similar in substance to that <br /> tute items . For the purposes of this paragraph specified , and be suited to the same use as <br /> 6 . 05 . A. 1 , a proposed item of material or that specified . The application will state the <br /> equipment will be considered functionally equal extent, if any, to which the use of the pro- <br /> to an item so named if: posed substitute item will prejudice <br /> CONTRACTOR's achievement of Substan- <br /> a , in the exercise of reasonable tial Completion on time , whether or not use <br /> judgment ENGINEER determines that: ( i ) it of the proposed substitute item in the Work <br /> is at least equal in quality , durability , will require a change in any of the Contract <br /> appearance , strength , and design Documents (or in the provisions of any other <br /> characteristics ; ( ii ) it will reliably perform at direct contract with OWNER for work on the <br /> least equally well the function imposed by Project) to adapt the design to the proposed <br /> the design concept of the completed Project substitute item and whether or not <br /> as a functioning whole , and ; incorporation or use of the proposed substi- <br /> tute item in connection with the Work is sub- <br /> b. CONTRACTOR certifies that: (i ) ject to payment of any license fee or royalty, <br /> there is no increase in cost to the OWNER ; All variations of the proposed substitute <br /> and ( ii ) it will conform substantially , even item from that specified will be identified in <br /> with deviations , to the detailed requirements the application , and available engineering , <br /> of the item named in the Contract sales , maintenance , repair, and <br /> Documents . replacement services will be indicated . The <br /> application will also contain an itemized esti- <br /> 2 . Substitute Items mate of all costs or credits that will result <br /> directly or indirectly from use of such <br /> a . If in ENGINEER's sole discretion an substitute item , including costs of redesign <br /> item of material or equipment proposed by and claims of other contractors affected by <br /> CONTRACTOR does not qualify as an any resulting change , all of which will be <br /> " or-equal " item under paragraph 6 . 05 . A . 11 it considered by ENGINEER in evaluating the <br /> will be considered a proposed substitute proposed substitute item . ENGINEER may <br /> item . require CONTRACTOR to furnish additional <br /> data about the proposed substitute item . <br /> b . CONTRACTOR shall submit suffi- <br /> cient information as provided below to allow B . Substitute Construction Methods or Proce- <br /> ENGINEER to determine that the item of duress If a specific means , method , technique , <br />se- <br /> 00700 - General Conditions REV 5- 10-13 doc <br /> 00700 - 20 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1341 -Historic Dodgertown (fka VB Sports Village) Room Renovations)\Admin\bid documents\Master Contract Docs\Master <br /> Contract <br /> Documents\00700 - General Conditions REV 5-10- 13. doc <br />