Laserfiche WebLink
2 . all the Work and materials and equip- 6 . 15 Hazard Communication Programs <br /> ment to be incorporated therein , whether in <br /> storage on or off the Site ; and A . CONTRACTOR shall be responsible for <br /> coordinating any exchange of material safety data <br /> 3 . other property at the Site or adjacent sheets or other hazard communication information <br /> thereto , including trees , shrubs , lawns , walks , required to be made available to or exchanged <br /> be- <br /> pavements , roadways , structures , utilities , and tween or among employers at the Site in accordance <br /> Underground Facilities not designated for with Laws or Regulations , <br /> removal , relocation , or replacement in the <br /> course of construction . 6 . 16 Emergencies <br /> B . CONTRACTOR shall comply with all applica- A . In emergencies affecting the safety or protec- <br /> ble Laws and Regulations relating to the safety of tion of persons or the Work or property at the <br /> Site or <br /> persons or property, or to the protection of persons or adjacent thereto , CONTRACTOR is obligated to act to <br /> property from damage , injury, or loss ; and shall erect prevent threatened damage , injury , or loss . <br /> and maintain all necessary safeguards for such safety CONTRACTOR shall give ENGINEER prompt written <br /> and protection . CONTRACTOR shall notify owners of notice if CONTRACTOR believes that any significant <br /> adjacent property and of Underground Facilities and changes in the Work or variations from the Contract <br /> other utility owners when prosecution of the Work may Documents have been caused thereby or are required <br /> affect them , and shall cooperate with them in the as a result thereof. If ENGINEER determines that a <br /> protection , removal , relocation , and replacement of change in the Contract Documents is required be- <br /> their property. All damage, injury , or loss to any cause of the action taken by CONTRACTOR in <br /> property referred to in paragraph 6 . 13 . A. 2 or 6 . 13 . A. 3 response to such an emergency, a Work Change <br /> caused , directly or indirectly , in whole or in part, by Directive or Change Order will be issued . <br /> CONTRACTOR , any Subcontractor, Supplier, or any <br /> other individual or entity directly or indirectly employed 6 . 17 Shop Drawings and Samples <br /> by any of them to perform any of the Work , or anyone <br /> for whose acts any of them may be liable , shall be A. CONTRACTOR shall submit Shop Drawings <br /> remedied by CONTRACTOR (except damage or loss to ENGINEER for review and approval in accordance <br /> attributable to the fault of Drawings or Specifications with the acceptable schedule of Shop Drawings and <br /> or to the acts or omissions of OWNER or ENGINEER Sample submittals . All submittals will be identified as <br /> or ENGINEER's Consultant, or anyone employed by ENGINEER may require and in the number of copies <br /> any of them , or anyone for whose acts any of them specified in the General Requirements . The data <br /> may be liable , and not attributable , directly or shown on the Shop Drawings will be complete with <br /> indirectly, in whole or in part, to the fault or negligence respect to quantities , dimensions , specified perfor- <br /> of CONTRACTOR or any Subcontractor, Supplier, or mance and design criteria , materials , and similar data <br /> other individual or entity directly or indirectly employed to show ENGINEER the services , materials , and <br /> by any of them ) . CONTRACTOR ' s duties and equipment CONTRACTOR proposes to provide and <br /> responsibilities for safety and for protection of the to enable ENGINEER to review the information for the <br /> Work shall continue until such time as all the Work is limited purposes required by paragraph 6 . 17 . E . <br /> completed and ENGINEER has issued a notice to <br /> OWNER and CONTRACTOR in accordance with B . CONTRACTOR shall also submit Samples to <br /> paragraph 14 . 07 . 13 that the Work is acceptable ENGINEER for review and approval in accordance <br /> (except as otherwise expressly provided in connection with the acceptable schedule of Shop Drawings and <br /> with Substantial Completion ) . Sample submittals . Each Sample will be identified <br /> clearly as to material , Supplier, pertinent data such as <br /> 6 . 14 Safety Representative catalog numbers , and the use for which intended and <br /> otherwise as ENGINEER may require to enable ENGI - <br /> A. CONTRACTOR shall designate a qualified NEER to review the submittal for the limited purposes <br /> and experienced safety representative at the Site required by paragraph 6 . 17 . E . The numbers of each <br /> whose duties and responsibilities shall be the Sample to be submitted will be as specified in <br /> the <br /> prevention of accidents and the maintaining and Specifications . <br /> supervising of safety precautions and programs . <br /> C . Where a Shop Drawing or Sample is required <br /> by the Contract Documents or the schedule of Shop <br /> Drawings and Sample submittals acceptable to ENGI - <br /> NEER as required by paragraph 2 . 07 , any related <br /> 00700 - General Conditions REV 5- 10- 13 doc <br /> 00700 - 24 <br /> F \Public Works\ENGINEERING DIVISION PROJECTS\1 341 -Historic Dodgertown (fka VB Sports Village) Room Renovations)VAdmin\bid documents\Master Contract Docs\Master <br /> Contract <br /> Documents\00700 - General Conditions REV 5- 10- 13. doc <br />