2 . all the Work and materials and equip- 6 . 15 Hazard Communication Programs
<br /> ment to be incorporated therein , whether in
<br /> storage on or off the Site ; and A . CONTRACTOR shall be responsible for
<br /> coordinating any exchange of material safety data
<br /> 3 . other property at the Site or adjacent sheets or other hazard communication information
<br /> thereto , including trees , shrubs , lawns , walks , required to be made available to or exchanged
<br /> be-
<br /> pavements , roadways , structures , utilities , and tween or among employers at the Site in accordance
<br /> Underground Facilities not designated for with Laws or Regulations ,
<br /> removal , relocation , or replacement in the
<br /> course of construction . 6 . 16 Emergencies
<br /> B . CONTRACTOR shall comply with all applica- A . In emergencies affecting the safety or protec-
<br /> ble Laws and Regulations relating to the safety of tion of persons or the Work or property at the
<br /> Site or
<br /> persons or property, or to the protection of persons or adjacent thereto , CONTRACTOR is obligated to act to
<br /> property from damage , injury, or loss ; and shall erect prevent threatened damage , injury , or loss .
<br /> and maintain all necessary safeguards for such safety CONTRACTOR shall give ENGINEER prompt written
<br /> and protection . CONTRACTOR shall notify owners of notice if CONTRACTOR believes that any significant
<br /> adjacent property and of Underground Facilities and changes in the Work or variations from the Contract
<br /> other utility owners when prosecution of the Work may Documents have been caused thereby or are required
<br /> affect them , and shall cooperate with them in the as a result thereof. If ENGINEER determines that a
<br /> protection , removal , relocation , and replacement of change in the Contract Documents is required be-
<br /> their property. All damage, injury , or loss to any cause of the action taken by CONTRACTOR in
<br /> property referred to in paragraph 6 . 13 . A. 2 or 6 . 13 . A. 3 response to such an emergency, a Work Change
<br /> caused , directly or indirectly , in whole or in part, by Directive or Change Order will be issued .
<br /> CONTRACTOR , any Subcontractor, Supplier, or any
<br /> other individual or entity directly or indirectly employed 6 . 17 Shop Drawings and Samples
<br /> by any of them to perform any of the Work , or anyone
<br /> for whose acts any of them may be liable , shall be A. CONTRACTOR shall submit Shop Drawings
<br /> remedied by CONTRACTOR (except damage or loss to ENGINEER for review and approval in accordance
<br /> attributable to the fault of Drawings or Specifications with the acceptable schedule of Shop Drawings and
<br /> or to the acts or omissions of OWNER or ENGINEER Sample submittals . All submittals will be identified as
<br /> or ENGINEER's Consultant, or anyone employed by ENGINEER may require and in the number of copies
<br /> any of them , or anyone for whose acts any of them specified in the General Requirements . The data
<br /> may be liable , and not attributable , directly or shown on the Shop Drawings will be complete with
<br /> indirectly, in whole or in part, to the fault or negligence respect to quantities , dimensions , specified perfor-
<br /> of CONTRACTOR or any Subcontractor, Supplier, or mance and design criteria , materials , and similar data
<br /> other individual or entity directly or indirectly employed to show ENGINEER the services , materials , and
<br /> by any of them ) . CONTRACTOR ' s duties and equipment CONTRACTOR proposes to provide and
<br /> responsibilities for safety and for protection of the to enable ENGINEER to review the information for the
<br /> Work shall continue until such time as all the Work is limited purposes required by paragraph 6 . 17 . E .
<br /> completed and ENGINEER has issued a notice to
<br /> OWNER and CONTRACTOR in accordance with B . CONTRACTOR shall also submit Samples to
<br /> paragraph 14 . 07 . 13 that the Work is acceptable ENGINEER for review and approval in accordance
<br /> (except as otherwise expressly provided in connection with the acceptable schedule of Shop Drawings and
<br /> with Substantial Completion ) . Sample submittals . Each Sample will be identified
<br /> clearly as to material , Supplier, pertinent data such as
<br /> 6 . 14 Safety Representative catalog numbers , and the use for which intended and
<br /> otherwise as ENGINEER may require to enable ENGI -
<br /> A. CONTRACTOR shall designate a qualified NEER to review the submittal for the limited purposes
<br /> and experienced safety representative at the Site required by paragraph 6 . 17 . E . The numbers of each
<br /> whose duties and responsibilities shall be the Sample to be submitted will be as specified in
<br /> the
<br /> prevention of accidents and the maintaining and Specifications .
<br /> supervising of safety precautions and programs .
<br /> C . Where a Shop Drawing or Sample is required
<br /> by the Contract Documents or the schedule of Shop
<br /> Drawings and Sample submittals acceptable to ENGI -
<br /> NEER as required by paragraph 2 . 07 , any related
<br /> 00700 - General Conditions REV 5- 10- 13 doc
<br /> 00700 - 24
<br /> F \Public Works\ENGINEERING DIVISION PROJECTS\1 341 -Historic Dodgertown (fka VB Sports Village) Room Renovations)VAdmin\bid documents\Master Contract Docs\Master
<br /> Contract
<br /> Documents\00700 - General Conditions REV 5- 10- 13. doc
<br />
|