My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-211A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:00:04 PM
Creation date
10/1/2015 5:47:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/22/2013
Control Number
2013-211A
Agenda Item Number
8.M.
Entity Name
OAC Action Construction
Subject
Contract Documents and Specifications
Historic Dodgertown Room Renovations
Project Number
1341
Bid Number
2014003
Alternate Name
Vero Beach Sports Village
Supplemental fields
SmeadsoftID
12688
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work performed prior to ENGINEER ' s review and accordance with the schedule of Shop <br /> approval of the pertinent submittal will be at the sole Drawings and Sample submittals acceptable to <br /> expense and responsibility of CONTRACTOR . ENGINEER . ENGINEER ' s review and <br /> approval will be only to determine if the items <br /> D . Submittal Procedures covered by the submittals will , after installation <br /> or incorporation in the Work , conform to the <br /> 1 . Before submitting each Shop information given in the Contract Documents <br /> Drawing or Sample , CONTRACTOR shall have and be compatible with the design concept of <br /> determined and verified : the completed Project as a functioning whole as <br /> indicated by the Contract Documents , <br /> a , all field measurements , quantities , <br /> dimensions , specified performance criteria , 2 . ENGINEER ' s review and approval <br /> installation requirements , materials , catalog will not extend to means , methods , techniques , <br /> numbers , and similar information with sequences , or procedures of construction <br /> respect thereto ; (except where a particular means , method , <br /> technique , sequence , or procedure of con- <br /> b . all materials with respect to intended struction is specifically and expressly called for <br /> use, fabrication , shipping , handling , storage , by the Contract Documents ) or to safety <br /> assembly, and installation pertaining to the precautions or programs incident thereto . The <br /> performance of the Work ; review and approval of a separate item as such <br /> will not indicate approval of the assembly in <br /> c. all information relative to means , which the item functions . <br /> methods , techniques , sequences , and <br /> procedures of construction and safety 3 . ENGINEER's review and approval of <br /> precautions and programs incident thereto ; Shop Drawings or Samples shall not relieve <br /> and CONTRACTOR from responsibility for any <br /> variation from the requirements of the Contract <br /> d . CONTRACTOR shall also have Documents unless CONTRACTOR has in <br /> reviewed and coordinated each Shop writing called ENGINEER ' s attention to each <br /> Drawing or Sample with other Shop such variation at the time of each submittal as <br /> Drawings and Samples and with the required by paragraph 6 . 17 . D . 3 and ENGk <br /> requirements of the Work and the Contract NEER has given written approval of each such <br /> Documents. variation by specific written notation thereof <br /> incorporated in or accompanying the Shop <br /> 2 . Each submittal shall bear a stamp or Drawing or Sample approval ; nor will any <br /> specific written indication that CONTRACTOR approval by ENGINEER relieve CON- <br /> has satisfied CONTRACTOR' s obligations TRACTOR from responsibility for complying <br /> under the Contract Documents with respect to with the requirements of paragraph 6 , 17 , D . 1 . <br /> CONTRACTOR 's review and approval of that <br /> submittal . F . Resubmittal Procedures <br /> 3 . At the time of each submittal , CON - 1 . CONTRACTOR shall make correc- <br /> TRACTOR shall give ENGINEER specific tions required by ENGINEER and shall return <br /> written notice of such variations , if any, that the the required number of corrected copies of <br /> Shop Drawing or Sample submitted may have Shop Drawings and submit as required new <br /> from the requirements of the Contract Samples for review and approval . CON- <br /> Documents , such notice to be in a written com- TRACTOR shall direct specific attention in <br /> munication separate from the submittal ; and , in writing to revisions other than the corrections <br /> addition , shall cause a specific notation to be called for by ENGINEER on previous <br /> made on each Shop Drawing and Sample sub- submittals . <br /> mitted to ENGINEER for review and approval of <br /> each such variation . 6 . 18 Continuing the Work <br /> E . ENGINEER 's Review A. CONTRACTOR shall carry on the Work and <br /> adhere to the progress schedule during all disputes or <br /> 1 . ENGINEER will timely review and disagreements with OWNER . No Work shall be <br /> approve Shop Drawings and Samples in delayed or postponed pending resolution of any <br /> 00700 - General Conditions REV 5- 10-13. doc <br /> 00700 - 25 <br /> F :%Public Works\ENGINEERING DIVISION PROJECTS\1341 -Historic Dodgertown (fka VB Sports Village) Room Renovations)Vadmin\bid documents\Master Contract Docs\Master <br /> Contract <br /> Documents\00700 - General Conditions REV 5-10-13. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.