Laserfiche WebLink
Work performed prior to ENGINEER ' s review and accordance with the schedule of Shop <br /> approval of the pertinent submittal will be at the sole Drawings and Sample submittals acceptable to <br /> expense and responsibility of CONTRACTOR . ENGINEER . ENGINEER ' s review and <br /> approval will be only to determine if the items <br /> D . Submittal Procedures covered by the submittals will , after installation <br /> or incorporation in the Work , conform to the <br /> 1 . Before submitting each Shop information given in the Contract Documents <br /> Drawing or Sample , CONTRACTOR shall have and be compatible with the design concept of <br /> determined and verified : the completed Project as a functioning whole as <br /> indicated by the Contract Documents , <br /> a , all field measurements , quantities , <br /> dimensions , specified performance criteria , 2 . ENGINEER ' s review and approval <br /> installation requirements , materials , catalog will not extend to means , methods , techniques , <br /> numbers , and similar information with sequences , or procedures of construction <br /> respect thereto ; (except where a particular means , method , <br /> technique , sequence , or procedure of con- <br /> b . all materials with respect to intended struction is specifically and expressly called for <br /> use, fabrication , shipping , handling , storage , by the Contract Documents ) or to safety <br /> assembly, and installation pertaining to the precautions or programs incident thereto . The <br /> performance of the Work ; review and approval of a separate item as such <br /> will not indicate approval of the assembly in <br /> c. all information relative to means , which the item functions . <br /> methods , techniques , sequences , and <br /> procedures of construction and safety 3 . ENGINEER's review and approval of <br /> precautions and programs incident thereto ; Shop Drawings or Samples shall not relieve <br /> and CONTRACTOR from responsibility for any <br /> variation from the requirements of the Contract <br /> d . CONTRACTOR shall also have Documents unless CONTRACTOR has in <br /> reviewed and coordinated each Shop writing called ENGINEER ' s attention to each <br /> Drawing or Sample with other Shop such variation at the time of each submittal as <br /> Drawings and Samples and with the required by paragraph 6 . 17 . D . 3 and ENGk <br /> requirements of the Work and the Contract NEER has given written approval of each such <br /> Documents. variation by specific written notation thereof <br /> incorporated in or accompanying the Shop <br /> 2 . Each submittal shall bear a stamp or Drawing or Sample approval ; nor will any <br /> specific written indication that CONTRACTOR approval by ENGINEER relieve CON- <br /> has satisfied CONTRACTOR' s obligations TRACTOR from responsibility for complying <br /> under the Contract Documents with respect to with the requirements of paragraph 6 , 17 , D . 1 . <br /> CONTRACTOR 's review and approval of that <br /> submittal . F . Resubmittal Procedures <br /> 3 . At the time of each submittal , CON - 1 . CONTRACTOR shall make correc- <br /> TRACTOR shall give ENGINEER specific tions required by ENGINEER and shall return <br /> written notice of such variations , if any, that the the required number of corrected copies of <br /> Shop Drawing or Sample submitted may have Shop Drawings and submit as required new <br /> from the requirements of the Contract Samples for review and approval . CON- <br /> Documents , such notice to be in a written com- TRACTOR shall direct specific attention in <br /> munication separate from the submittal ; and , in writing to revisions other than the corrections <br /> addition , shall cause a specific notation to be called for by ENGINEER on previous <br /> made on each Shop Drawing and Sample sub- submittals . <br /> mitted to ENGINEER for review and approval of <br /> each such variation . 6 . 18 Continuing the Work <br /> E . ENGINEER 's Review A. CONTRACTOR shall carry on the Work and <br /> adhere to the progress schedule during all disputes or <br /> 1 . ENGINEER will timely review and disagreements with OWNER . No Work shall be <br /> approve Shop Drawings and Samples in delayed or postponed pending resolution of any <br /> 00700 - General Conditions REV 5- 10-13. doc <br /> 00700 - 25 <br /> F :%Public Works\ENGINEERING DIVISION PROJECTS\1341 -Historic Dodgertown (fka VB Sports Village) Room Renovations)Vadmin\bid documents\Master Contract Docs\Master <br /> Contract <br /> Documents\00700 - General Conditions REV 5-10-13. doc <br />