My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-211A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:00:04 PM
Creation date
10/1/2015 5:47:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/22/2013
Control Number
2013-211A
Agenda Item Number
8.M.
Entity Name
OAC Action Construction
Subject
Contract Documents and Specifications
Historic Dodgertown Room Renovations
Project Number
1341
Bid Number
2014003
Alternate Name
Vero Beach Sports Village
Supplemental fields
SmeadsoftID
12688
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -13 . 03 Test and Inspections <br /> SC - 13 . 03 . B . Delete paragraph GC- 13. 03. 8 in its entirety, and insert the following sentences in <br /> its place: <br /> B . OWNER shall employ and pay for the services of an independent testing laboratory to <br /> perform all initial inspections , tests , or approvals required by the Contract Documents <br /> except those inspections , tests , or approvals listed immediately below . Subsequent <br /> inspections , tests , or approvals required after initial failing inspections , tests , or <br /> approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br /> applications for payment . The CONTRACTOR shall arrange , obtain , and pay for the <br /> following inspections , tests , or approvals : <br /> 1 . inspections , tests , or approvals covered by paragraphs 13 . 03 . 0 and 13 . 03 . D <br /> below ; <br /> 29 costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13 . 04 . 13 shall be paid as provided in said paragraph 13 . 04 . 13 ; <br /> 30 tests otherwise specifically provided in the Contract Documents . <br /> SCA 105 OWNER May Stop the Work <br /> SC- 13 . 05 . A . Delete paragraph GC- 13. 05. A in its entirety and insert the following paragraph in its <br /> place: <br /> A . If the Work is defective , or CONTRACTOR fails to supply sufficient skilled <br /> workers or suitable materials or equipment , or fails to comply with permit <br /> requirements , or fails to comply with the technical specifications , or fails to <br /> perform the Work in such a way that the completed Work will conform to the <br /> Contract Documents , OWNER may order CONTRACTOR to stop the Work , or any <br /> portion thereof, until the cause for such order has been eliminated ; however, this <br /> right of OWNER to stop the Work shall not give rise to any duty on the part <br /> of <br /> OWNER to exercise this right for the benefit of CONTRACTOR , any <br /> Subcontractor, any Supplier, any other individual or entity , or any surety for, or <br /> employee or agent of any of them . <br /> SC - 13 . 07 Correction Period <br /> SC- 13 . 07 A . Delete the first sentence of paragraph GC43. 07. A in its entirety and insert the <br /> following sentence in its place <br /> A . If within one year after the date of Final Completion or such longer period of time <br /> as may be prescribed by Laws or Regulations or by the terms of any applicable <br /> special guarantee required by the Contract Documents or by any specific provision <br /> of the Contract Documents , any Work is found to be defective , or if the repair of <br /> any damages to the land or areas made available for CONTRACTOR ' s use by <br /> OWNER or permitted by Laws and Regulations as contemplated in paragraph <br /> 6 . 11 . A is found to be defective , CONTRACTOR shall promptly , without cost to <br /> OWNER and in accordance with OWNER ' s written instructions : ( i ) repair such <br /> defective land or areas , or ( ii ) correct such defective Work or, if the defective Work <br /> has been rejected by OWNER , remove it from the Project and replace it with Work <br /> that is not defective , and ( iii ) satisfactorily correct or repair or remove and replace <br /> any damage to other Work , to the work of others or other land or areas resulting <br /> therefrom . <br /> 00800-8 <br /> 00800 - Supplementary Conditions 05- 13 rev . doc <br /> 00800 8F \Public Worw. s\ F NGINEERING DIVISION PROJECTS\ 1341 Historic Dodgertown (fka VB Sports Village ) Room Renovations )Mmin\bid documents\Master <br /> Contract <br /> Docs\Master Contract Doc, .ments\00800 - Supplementary Conditions O` - ? 3 rev doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.