counter area . <br /> c ) Remove and replace existing outlets and switches in room , white <br /> decor switches and receptacles . <br /> d ) Remove and replace all TV, computer and telephone jacks . <br /> e ) Reinstall bathroom fixtures and closet lights . <br /> REMEDIAL FRAMING AND HARDWARE INSTALLATION <br /> a ) Remove section of the closet wall to create an opening for a <br /> countertop leaving a header the same height as the doorway and <br /> the base for partition wall at 36" high . AFF <br /> b ) Frame new 24- inch deep closet . <br /> c ) Supply and install new countertop with bevel edge laminate . Install <br /> reinforcing panels and support beams beneath counter. Colorto be <br /> selected . 2" computer grommet to pass through counter . <br /> d ) Supply and install flat slab 72" bi - pass door at new closet . Johnson <br /> Model # 138F Fascia track with heavy duty hardware . Hollow core <br /> hardboard primed 1 - 3/8" doors, doors to have four solid wood <br /> edges . <br /> e ) Supply and install 2- 1/2 " round Ives satin nickel bkpass pulls . <br /> f) Supply and install Deltana 34/2 " x 34/2 " square steel US15 satin <br /> nickel door hinges and door strikes . <br /> g ) Remove existing closet shelf and re- install . <br /> h ) Remove and replace bathroom door. Hollow core hardboard <br /> primed 1- 3/8" doors , doors to have four solid wood edges . <br /> i ) Remove and replace any damaged base or casing . ( Match existing ) <br /> j ) Remove and replace front window sill with standard marble and the <br /> bathroom window sill with standard marble . <br /> k ) New full length mirror, 20" x 60" frameless with clips . <br /> FLOORING <br /> a ) Supply and install bathroom flooring 18" x 18 " rectified porcelain <br /> tile, minimum tile grout lines, grout and tile to be sealed . Dal -Tile <br /> Palatina PT 95 . <br /> b ) Supply and install 4" base board porcelain tile . <br /> c ) Tile to be installed on a diagonal . <br /> d ) Room carpet to be removed and re- installed with new anti- microbial <br /> pads and nail strips . <br /> PAINTING & DRYWALL FINISH <br /> a ) Bathroom drywall to be replaced with % " MR board . <br /> b ) Apply Gardz on all wall surfaces, skim walls to level 4 finish and <br /> apply medium knockdown texture . ( NOTE : Some rooms will not <br /> require knockdown texture . ) <br /> 01310-3 01310 Detailed Construction Scope of Work <br /> F \Public Works\ENGINEERING DIVISION PROJECTS\1341 - Historic Dodgertown (fka VB Sports Village ) Room <br /> Renovations)Vldmin\bid documents\Master Contract Docs\Master Contract Documents\01310 - Detailed Construction Scope of <br /> Work .doc <br />