My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-211A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:00:04 PM
Creation date
10/1/2015 5:47:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/22/2013
Control Number
2013-211A
Agenda Item Number
8.M.
Entity Name
OAC Action Construction
Subject
Contract Documents and Specifications
Historic Dodgertown Room Renovations
Project Number
1341
Bid Number
2014003
Alternate Name
Vero Beach Sports Village
Supplemental fields
SmeadsoftID
12688
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> C . Group of 5/6 rooms — Substantially complete within 16 days <br /> Final Completion within 19 days <br /> Start on a Monday — the 191h day would be a Friday ready to <br /> be rented out <br /> D . Owner can ask contractor to demobilize for 19 calendar days, but not more than <br /> two occurrences . <br /> E . The tentative schedule shown in Section 00520 is only tentative, and the objective <br /> is to complete the renovations long before final date of October 24, 2014 . <br /> Coordination with Verotown , LLC . <br /> Permits <br /> A. It is the contractor' s responsibility to obtain and pay for all permit fees required for the <br /> project . Also, any additional drawings needed to obtain the permits is the responsibility of <br /> the contractor. <br /> Bid Line Items <br /> A . Each room is being bid independently, since there will be varying work required for each <br /> room , we strongly recommend that you visit every room . <br /> B . Exterior doors are bid separately since the rooms requiring doors are sporadic and also <br /> include previously renovated rooms . <br /> C . In the nine suites, there are existing 46" flat screen TVs . The contractor is to provide the <br /> wall mount brackets for these TVs and install them . <br /> D . Storage facilities for the furniture and other items to be removed from the rooms during <br /> renovation are bid per week for storage facilities adequately sized to store furnishings from <br /> 5 — 6 rooms . <br /> Location of storage facilities will be west of Field No . 4 near warehouse by right <br /> center field . See attached Plan Sheet 2A for location . <br /> Clean Up <br /> A . Contractor is responsible to keep work area clean . His responsibility includes providing <br /> construction dumpster and cleaning scrap materials and debris on a daily basis . <br /> Dumpster shall be in front of group of rooms being renovated . Contractor to <br /> provide security fencing around work area and dumpster. <br /> Safekeeping of existing items removed , stored and reinstalled in rooms is the responsibility of the <br /> contractor. Prior to renovating, contractor is responsible to inventory the furnishings and list all <br /> existing damages . This should be coordinated with the Owner' s on -site representative ( Dan <br /> Wittenberg) . <br /> Bathroom facilities will not be available on site . Contractor must provide " portapotty" per <br /> appropriate building codes . <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\ 1341 -Historic Dodgertown ( fka VB Sports Village) Room <br /> Renovations)\Admin\Meetings\Pre-Bid Meeting Minutes and Questions 09-25-2013 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.