My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-113a
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-113a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 12:07:54 PM
Creation date
10/1/2015 5:22:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
06/18/2013
Control Number
2013-113a
Agenda Item Number
12.I.2
Entity Name
Proctor Construction Company
Subject
Change Order No.2 Prime Contract Change Order
IRCSO Vehicle Storage Facility
Area
Indian River Crime Scene Investigation Facility
Project Number
IRC-CS101/2013
Supplemental fields
SmeadsoftID
11998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> I <br /> CATSREWINIMSION 100, 1 NCm <br /> 5550 41" STREET * VERO BEACH, FL 32967 * (772) 562-8814 * FAX (772) 5624173 <br /> cathcoinc@bellsouth.net j <br /> Date: June 3 , 2013 <br /> i <br /> To: Proctor Construction Company <br /> 2050 US- 1 Suite 200 <br /> Vero Beach, Florida 32960 <br /> Budget For: IRC Vehicle Storaee Barn f <br /> Vero Beach, Florida <br /> We hereby propose to furnish labor, equipment and materials for the following: I <br /> i <br /> ITEM QUANTITY BUDGET <br /> Building Pad 1 ,200 CY Import Fill; 1 ,225 SY Grade $ 139000. 00 <br /> Site Cut, Fill & Grade 2,295 CY Import Fill ; 3 ,705 SY Grade $ 37,000. 00 <br /> 725 CY — Cut Swale <br /> Water System 100 LF I " Poly; Tie to Existing $ 950.00 <br /> i <br /> Storm Drainage 200 LF 18" CAP $ 15, 500.00 <br /> 80 LF 8" ADS i <br /> 320 LF 6" ADS <br /> 15 EA Downspouts <br /> Storm Structures 2 EA Type "C" $ 60150.00 <br /> 1 EA — Control Structure <br /> i <br /> 8" Stabilization 11180 SY $ 59900. 00 <br /> 6" Coquina Rock 1 , 150 SY $ 10,925.00 <br /> 1 . 5" S4 Asphalt 1 , 120 SY ' $ 19,320.00 j <br /> I <br /> For the total budget amount of: $1089745.00 j <br /> NOTES : ` <br /> 1 . This is Only a Budget Number Based on Drawing Sent on May 29, 2013 , Cathco Will <br /> Finalize Price After We Receive a Completed Set of Plans and Specifications. <br /> 2 . Proposal Includes Importing 2 Feet of Fill For Building Pad and Site. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.