My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-113a
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-113a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 12:07:54 PM
Creation date
10/1/2015 5:22:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
06/18/2013
Control Number
2013-113a
Agenda Item Number
12.I.2
Entity Name
Proctor Construction Company
Subject
Change Order No.2 Prime Contract Change Order
IRCSO Vehicle Storage Facility
Area
Indian River Crime Scene Investigation Facility
Project Number
IRC-CS101/2013
Supplemental fields
SmeadsoftID
11998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Cathco, Inc Budget for IRC Vehicle Storage Barn <br /> June 3, 2013 <br /> SPECIFICALLY EXCLUDED FROM THIS BUDGET ARE THE FOLLOWING ITEMS: I <br /> Permits ; Engineering; Bonds & Fees; Sod, Seed & Mulch, and Landscaping; Irrigation System; <br /> Repair/Relocation of Existing Utilities/Services in Conflict with this Work; Removal, Disposal <br /> and Replacement of Unsuitable Materials; Demucking; Driveway Sidewalks; Concrete Flatwork; <br /> Erosion Control; Power Pole RemovallRelocation; i <br /> i <br /> Due to volatility in the worldwide asphalt market, prices for asphaltic concrete quoted wherein ' <br /> are null and void should theprice of liquid asphalt exceed $ 700 per ton. <br /> i <br /> Should the Federal Court render as adverse decision on the Lake Belt ruling, asphalt aggregate <br /> may become too scarce to guarantee supply. Asphalt prices included in this quotation would <br /> become null and void. <br /> Not responsible for birdbaths or water flow when projects are designed with less than 2% fall on <br /> asphalt pavement . ' <br /> It is Cathco' s intention to place all pipe and structures by properly sloping the excavation in <br /> observance of the Florida Trench Safety Act . It is not our intent, unless specified in this <br /> proposal, to sheet, shore or employ a trench box. Therefore, we must look to you to provide us <br /> with adequate room to use the slope method. Should it be more convenient for you to require us <br /> to sheet or shore, the cost of such measures will be for your account. Further, the use of a trench <br /> box will add $20.00 per lineal foot to the unit pipe prices. <br /> The excavation, treatment or disposal of contaminated soil, (as defined by the guidelines of the L <br /> Environmental Protection Agency), that may be encountered during the course of this project <br /> shall not be considered incidental to the work. The cost of such excavation, treatment or disposal <br /> by those properly licensed will be the responsibility of the owner. <br /> ; <br /> I <br /> Res 11 ' tted, <br /> l <br /> Eisert <br /> As Agent for Cathco, Inc. <br /> i <br /> I <br /> E <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.