My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-113a
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-113a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 12:07:54 PM
Creation date
10/1/2015 5:22:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
06/18/2013
Control Number
2013-113a
Agenda Item Number
12.I.2
Entity Name
Proctor Construction Company
Subject
Change Order No.2 Prime Contract Change Order
IRCSO Vehicle Storage Facility
Area
Indian River Crime Scene Investigation Facility
Project Number
IRC-CS101/2013
Supplemental fields
SmeadsoftID
11998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> V <br /> i <br /> i <br /> Exhibit "8" Assumptions and Clarifications <br /> 11 At least on a quarterly basis during theproject time the Owner shall <br /> provide updated and clouded design drawings of full size incorporating <br /> all sketches and all design clarifications. <br /> 12 We do NOT include the cost required for the subcontractors to provide a <br /> payment and performance bond for the project. <br /> I <br /> 13 We do NOT include additional attic stock for materials, except what is <br /> specifically listed in the specification manual, or in these Assumptions j <br /> and Clarifications. <br /> 14 We have assumed that this project will run concurrent with the IRCSO <br /> Crime Lab Project currently under construction. <br /> 15 We will provide as-built drawings as required by the contract documents. <br /> 16 We do NOT include over timelpremium time for any of our <br /> subcontractors. <br /> I <br /> 17 We do NOT include the excessive escalation costs causcd by <br /> circumstances beyond our control of any materials due to anomalies of <br /> any kind. <br /> 18 We do NOT include unforeseen conditions which prohibit the scope of <br /> this work. <br /> yi <br /> i <br /> 19 We do NOT include the cost for Electrical Service for the any duration of <br /> the project. We include the cost for temporary cicctrical service for our <br /> trailer only. j <br /> a <br /> 22 We assume that once the project drawings are complete Proctor will be <br /> allowed to reprice the project to confirm the assumptions made herein <br /> i <br /> Siteworks i <br /> 1 We have included an allowance for Landscaping which includes the <br /> following: (Fifteen ( 15) Code Required Buffer Trees; One Hundered and <br /> Sixty ( 160) Buffer Hedges @ 2'-0" O.C; 29,700 SF of Bahia Sod; 15, 400 j <br /> SF of Bahia Sod for the Drainage Swale. <br /> 2 We have included an allowance of $4,000 for Irrigation for new <br /> Landscaping. <br /> I <br /> i <br /> 3 We do NOT include maintenance of landscaping or irrigation at any <br /> time. <br /> Page 2 of 6 <br /> F _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.