My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-113a
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-113a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 12:07:54 PM
Creation date
10/1/2015 5:22:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
06/18/2013
Control Number
2013-113a
Agenda Item Number
12.I.2
Entity Name
Proctor Construction Company
Subject
Change Order No.2 Prime Contract Change Order
IRCSO Vehicle Storage Facility
Area
Indian River Crime Scene Investigation Facility
Project Number
IRC-CS101/2013
Supplemental fields
SmeadsoftID
11998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Exhibit "B" Assumptions and Clarifications <br /> i <br /> 4 We do NOT include the excavation, removal or contention with any rock <br /> or muck <br /> i <br /> 5 We include importing two (2) feet of fill for the building pad. 1200CY of <br /> Import Fill for the Building Pad. <br /> 6 We include 2,295 CY Import Fill, 3705 SY Grading and 725CY of Cut <br /> for the Drainage Swale for the Site Cut, Fill & Grade. <br /> i <br /> 7 We include 100LF of 1 " Poly and the tie into the existing Water Line, <br /> 8 We include 200LF 18" CAP; 80 LF of 8" ADS, 320 LF 6" ADS Storm <br /> Drainage. This includes connection to downspouts. We include two (2) <br /> Type "D" Structures and 1 Control Structure. <br /> 9 We include 1120 SY of 1 . 5" S4 Asphalt Pavement. We include 1 , 180 SY <br /> of 8" Stabilization and 1 , 150 SY of 6" Coquina Rock. <br /> 10 Due to the uncertainty of the liquid index for asphalt, the cost included in <br /> the GMP may be subjoct to re-negotiation if the liquid price increases by <br /> more than five percent (5%) prior to commencement of the paving <br /> project. <br /> Concrete <br /> i <br /> i <br /> 1 We include a Continuous Footing and Pad Footings at Metal Building <br /> Columns with size based upon RF Concrete's previous ex enence in 4 <br /> 1? P P <br /> cor}junction with the detail provided by Mike Lue. <br /> 2 We include Termite Treatment under slab on grade. <br /> 3 We include 5" thick w/ #8 wire mesh and 6 mil vapor barrier for slab on j <br /> grade. <br /> 4 The concrete pricing is set to increase by $7/yd if not provided a written <br /> agreement by July 1 , 2013. The pricing include in this proposal is based <br /> upon securing the job prior to July 1st. <br /> Masonry <br /> 1 We do NOT include any Concrete Masonry. <br /> Pape 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.