I <br /> Exhibit "B" Assumptions and Clarifications <br /> i <br /> 4 We do NOT include the excavation, removal or contention with any rock <br /> or muck <br /> i <br /> 5 We include importing two (2) feet of fill for the building pad. 1200CY of <br /> Import Fill for the Building Pad. <br /> 6 We include 2,295 CY Import Fill, 3705 SY Grading and 725CY of Cut <br /> for the Drainage Swale for the Site Cut, Fill & Grade. <br /> i <br /> 7 We include 100LF of 1 " Poly and the tie into the existing Water Line, <br /> 8 We include 200LF 18" CAP; 80 LF of 8" ADS, 320 LF 6" ADS Storm <br /> Drainage. This includes connection to downspouts. We include two (2) <br /> Type "D" Structures and 1 Control Structure. <br /> 9 We include 1120 SY of 1 . 5" S4 Asphalt Pavement. We include 1 , 180 SY <br /> of 8" Stabilization and 1 , 150 SY of 6" Coquina Rock. <br /> 10 Due to the uncertainty of the liquid index for asphalt, the cost included in <br /> the GMP may be subjoct to re-negotiation if the liquid price increases by <br /> more than five percent (5%) prior to commencement of the paving <br /> project. <br /> Concrete <br /> i <br /> i <br /> 1 We include a Continuous Footing and Pad Footings at Metal Building <br /> Columns with size based upon RF Concrete's previous ex enence in 4 <br /> 1? P P <br /> cor}junction with the detail provided by Mike Lue. <br /> 2 We include Termite Treatment under slab on grade. <br /> 3 We include 5" thick w/ #8 wire mesh and 6 mil vapor barrier for slab on j <br /> grade. <br /> 4 The concrete pricing is set to increase by $7/yd if not provided a written <br /> agreement by July 1 , 2013. The pricing include in this proposal is based <br /> upon securing the job prior to July 1st. <br /> Masonry <br /> 1 We do NOT include any Concrete Masonry. <br /> Pape 3 of 6 <br />