Laserfiche WebLink
I <br /> i <br /> Exhibit "B" Assumptions and Clarifications <br /> I <br /> Metals <br /> 1 We include CECO Metal Building 80' x 125' Open Bay Structure and <br /> i <br /> attached enclosed 25' x 40' Metal Building, <br /> 2 We include CECO Metal Building 152mph, Exposure C, 2010 FL Bldg <br /> Code. <br /> 3 We include CECO Metal Building with the following features: V by 12" <br /> Roof Slope; 164' Eave Height; 24ga PBR screw-down panels as <br /> Galvalume Plus; 26ga PBR panel, Sig 200, Standard Colors . <br /> 4 We include all trim, gutters and downspouts on both sides on main 80' x <br /> 125' building. II <br /> 5 We include all primary and secondary framing as red oxide primer on <br /> closed portion of the building. We include hot dipped galvanizing in the <br /> open bay primary and secondary structural members. <br /> 6 We include an allowance of $3,500 for Metal Bollards for Column <br /> Protection. <br /> I <br /> Wood <br /> i <br /> 1 We do NOT include any Woodwork. <br /> Thermal & Moisture Protection <br /> i <br /> 1 We do NOT include any building insulation. <br /> i <br /> 2 We do NOT include any waterproofing. <br /> Doors & Windows <br /> 1 We do NOT included any field testing of windows or storefronts. <br /> i <br /> 2 We do NOT include any windows. <br /> i <br /> 3 We include ( 1 ) 14' x 10 Roll-up Door with Powder Coat. <br /> i <br /> 4 We include an allowance of $800 for two (2) hollow metal frames, doors <br /> and hardware. <br /> Finishes <br /> Page 4 of 6 <br />