My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-113a
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-113a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 12:07:54 PM
Creation date
10/1/2015 5:22:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
06/18/2013
Control Number
2013-113a
Agenda Item Number
12.I.2
Entity Name
Proctor Construction Company
Subject
Change Order No.2 Prime Contract Change Order
IRCSO Vehicle Storage Facility
Area
Indian River Crime Scene Investigation Facility
Project Number
IRC-CS101/2013
Supplemental fields
SmeadsoftID
11998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> Exhibit "B" Assumptions and Clarifications <br /> I <br /> 1 We do NOT include any finishes. <br /> i <br /> 1 <br /> Specialties <br /> 1 We do NOT any specialties. <br /> Equipment <br /> 1 We do NOT anv eauinment <br /> Furnishings j <br /> i <br /> I <br /> 1 We do NOT include loose furniture or furnishings . We do NOT include <br /> the installation of loose furniture or furnishings. <br /> �I <br /> I <br /> Vertical Transportation I� <br /> i <br /> 1 N/A <br /> Plumbing <br /> 1 We do NOT include any P plumbing .' worki <br /> I <br /> I <br /> Fire Protection <br /> 1 <br /> 1 We include a wet pipe NFPA 13 fire sprinkler system hydraulically <br /> designed in strict accordance with NFPA 13 standards. <br /> I <br /> 2 We include tapping into the existing main servicing the Crime Scene <br /> Building and bringing the new main 200 LF to service the now facility. <br /> 3 We include upright heads and exposed black sprinkler pipe in allareas. <br /> We do NOT include galvanizing of sprinkler piping. <br /> HVAC <br /> I <br /> 1 We include an allowance of $4,000 for a Louver and Exhaust Fan. <br /> I <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.