My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 2:54:28 PM
Creation date
10/1/2015 5:58:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/11/2014
Control Number
2014-028A
Agenda Item Number
8.H.
Entity Name
R.J. Sullivan Corp.
Subject
Central WWTP Sludge Holding Tank Modification
Project Number
IRC No.2014006
Supplemental fields
SmeadsoftID
13063
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />OFFICE OF MANAGEMENT AND BUDGET <br />PURCHASING DIVISION <br />CONSENT /t(jI:'.NDA <br />D ATE: March 4, 2014 <br />TO: BOARD OF COUNTY COMMISSIONERS <br />THROUGH: Joseph A. Baird, County Administrate <br />Jason E. Brown, Budget Director <br />FROM: Jennifer Hyde, Purchasing Manager <br />SUBJECT: Approval of Bid Award for IRC Bid No. 2014006 Central WWTP Sludge Holding <br />Tank Modifications and Request for Budget Amendment <br />BACKGROUND: <br />The Department of Utility Services requested the solicitation of bids for improvements to the <br />Central WWTP Sludge Handling Facility. The proposed work includes demolition and removal of <br />equipment and materials no longer in use at the plant and construction of new truck filling <br />facilities and a new sludge recirculation system. These improvements are designed to improve <br />safety and efficiency in the sludge handling operation at the plant. <br />BIDRESULTS: <br />Bid Opening Date: <br />Advertising Date: <br />D emandstar Broadcast to: <br />Specifications/Plans Downloaded by: <br />Replies: <br />D ecember 18, 2013 <br />N ovember 25, 2013 <br />762 Subscribers <br />50 Vendors <br />3 Vendors <br />Bidder <br />Location <br />Base Bid Price <br />Florida Design <br />Contractors <br />Lake Park <br />$705,000.00 <br />R. J. Sullivan Corp. <br />Pompano Beach <br />$654,000.00 <br />Summit Construction of Vero Beach, LLC <br />Vero Beach <br />$707,000.00 <br />The Department's Consulting Engineer for this project, Masteiler & Moler, Inc. reviewed the bids <br />submitted and has determined all three bids accurately reflect the work as defined by the plans <br />and specifications, and recommended award to R.J. Sullivan Corp. <br />ENGINEER'S ESTIMATE: <br />The engineer's estimate for the work, initially developed several years ago, was $400,000. Staff <br />worked closely with Masteiler & Moler throughout the design and final scope development and is <br />confident the project, as bid, is necessary to facilitate efficient and safe operations at the plant. <br />AVIlids 1013.2014 PV (2014000fUle•JO6 Cvntr.l WWII' Sludge Iloldhig Idak Mods'Agenda•2014006.doc <br />66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.