My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-123A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-123A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 12:10:34 PM
Creation date
10/1/2015 4:34:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/03/2012
Control Number
2012-123A
Agenda Item Number
8.N.
Entity Name
Ranger Construction
Subject
Contract Documents and Specifications
27th Avenue Milling and Resurfacing
Area
27th Avenue, Oslo Road to SR 60
Project Number
0391
Bid Number
2012029
Supplemental fields
SmeadsoftID
11356
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . inspections , tests , or approvals covered by paragraphs 13 . 03 . 0 and 13 . 03 . D <br /> below ; <br /> 2 , costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13 . 04 . 13 shall be paid as provided in said paragraph 13 . 04 . 13 ; <br /> 36 tests otherwise specifically provided in the Contract Documents . <br /> 13 . 05 OWNER May Stop the Work <br /> SC- 13 . 05 . A . Delete paragraph GC- 13. 05. A in its entirety and insert the following paragraph in its <br /> place: <br /> A . If the Work is defective , or CONTRACTOR fails to supply sufficient skilled <br /> workers or suitable materials or equipment , or fails to comply with permit <br /> requirements , or fails to comply with the technical specifications , or fails to <br /> perform the Work in such a way that the completed Work will conform to the <br /> Contract Documents , OWNER may order CONTRACTOR to stop the Work , or any <br /> portion thereof, until the cause for such order has been eliminated ; however, this <br /> right of OWNER to stop the Work shall not give rise to any duty on the part <br /> of <br /> OWNER to exercise this right for the benefit of CONTRACTOR , any <br /> Subcontractor, any Supplier, any other individual or entity , or any surety for, or <br /> employee or agent of any of them . <br /> 14 . 02 Progress Payments <br /> SC- 14 . 02 . B . 5 . Delete paragraph GC44. 02. 8. 5. d in its entirety and insert the following paragraph <br /> in its place: <br /> d . ENGINEER has actual knowledge of the occurrence of any of the events <br /> enumerated in paragraph 15 . 02 . A ; or <br /> SC- 14 . 02 . 13 . 5 . Add the following sentences at the end of paragraph GC44. 02. B . 5: <br /> e . OWNER has been required to pay ENGINEER additional compensation because <br /> of CONTRACTOR delays or rejection of defective Work ; or <br /> f. OWNER has been required to pay an independent testing laboratory for <br /> subsequent inspections , tests , or approvals taken after initial failing inspections , <br /> tests , or approvals . <br /> SC- 14 . 02 . C . 1 . Delete paragraph GC44 . 02. CA in its entirety and insert the following <br /> paragraph in its place: <br /> C . Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the Local <br /> Government Prompt Payment Act . F . S . 218 . 70 et . seq . <br /> SC - 14 . 04A . After the third sentence in paragraph GC44 . 04A of the General Conditions, <br /> delete the remainder of paragraph 14 . 04A in its entirety and replace with the following: <br /> " If Engineer considers the Work substantially complete , Engineer will prepare <br /> and deliver to Owner a tentative certificate of Substantial Completion that shall fix <br /> 00800-7 <br /> 00800 - Supplementary Conditions 06-09 rev . doc <br /> 00800 7FAPublic Works\ENGINEERING DIVISION PROJECTS\0391 -27th Ave at 5th St SW\Admim\Contract Documents\00800 - Supplementary Conditions 06-09 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.