My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-123A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-123A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 12:10:34 PM
Creation date
10/1/2015 4:34:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/03/2012
Control Number
2012-123A
Agenda Item Number
8.N.
Entity Name
Ranger Construction
Subject
Contract Documents and Specifications
27th Avenue Milling and Resurfacing
Area
27th Avenue, Oslo Road to SR 60
Project Number
0391
Bid Number
2012029
Supplemental fields
SmeadsoftID
11356
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the date of Substantial Completion . In accordance with the provisions of Florida <br /> Statutes section 208 . 735 ( 7 ) ( x ) ( 2005 ) , upon receipt of the tentative certificate of <br /> Substantial Completion from Engineer , the Owner , the Engineer , and the <br /> Contractor shall conduct a walk-through inspection of the Project to document a <br /> list of any items required to render the Work on the Project complete , <br /> satisfactory , and acceptable under this Agreement ( herein the " Statutory List" ) . <br /> The Statutory List shall be reduced to writing and circulated among the Owner , <br /> the Engineer , and the Contractor by the Owner or the Engineer within 30 <br /> calendar days after substantial completion . The Owner and Contractor <br /> acknowledge and agree that : 1 ) the failure to include any corrective work , or <br /> pending items that are not yet completed , on the Statutory List does not alter the <br /> responsibility of the Contractor to complete all of the Work under this Agreement ; <br /> 2 ) upon completion of all items on the Statutory List , the Contractor may submit a <br /> pay request for all remaining retainage except as otherwise set forth in this <br /> Agreement ; and 3 ) any and all items that require correction under this Agreement <br /> and that are identified after the preparation of the Statutory List remain the <br /> obligation of the Contractor to complete to the Owner' s satisfaction under this <br /> Agreement . After receipt of the Statutory List by the Contractor, the Contractor <br /> acknowledges and agrees that it will diligently proceed to complete all items on <br /> the Statutory List and schedule a final walk-through in anticipation of final <br /> completion on the Project . " <br /> SC- 14 . 04B Add the following new paragraph immediately after paragraph GC 14 . 04B: <br /> C . At the time of delivery of the tentative certificate of Substantial Completion , Engineer will <br /> deliver to Owner and Contractor a written recommendation as to division of responsibilities <br /> pending final payment between Owner and Contractor with respect to security , operation , <br /> safety , and protection of the Work , maintenance , heat , utilities , insurance , and warranties and <br /> guarantees <br /> SC - 14 . 07 Final Payment <br /> SC- 14 . 07 . C . 1 . Delete paragraph GC- 14. 07. C. 1 in its entirety and insert the following <br /> paragraph in its place : <br /> C . Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the " Local <br /> Government Prompt Payment Act" , Florida Statutes section 218 . 70 , et . seq . <br /> SC - 15 . 01 OWNER May Suspend Work <br /> SC - 15 . 01 . A Delete the last sentence in paragraph GC- 15. 01 . A and insert the following in its <br /> place : <br /> CONTRACTOR shall be allowed an extension of the Contract Times , directly attributable to any <br /> such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph <br /> 10 . 05 . CONTRACTOR shall not be allowed an adjustment of the Contract Price and <br /> CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other eco- <br /> nomic loss arising out of or resulting from such Work suspension . <br /> SC - 15 . 02 OWNER May Terminate For Cause <br /> SC - 15 . 02 . A . 5 and SC - 15 . 02 . A . 6 Add the following new paragraphs immediately after <br /> paragraph GC- 15. 02. A . 4: <br /> 00800-8 <br /> 00800 - Supplementary Conditions 06-09 rev . doc <br /> 00800 8F :\Public Works\ENGINEERING DIVISION PROJECTS\0391 -27th Ave at 5th St SW\Admim\Contract Documents\00800 - Supplementary Conditions 06-09 rev <br />.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.