Laserfiche WebLink
Sector 3 Beach & Dune Restoration Project Attachment 1 to Change Order No . I <br /> coastal panic grasses , 4 % railroad vine , and 3 % dune sunflower . The total <br /> quantities of plants to be installed thus are as described in the Plant Schedule <br /> below : <br /> Phase 1. - Plant Schedule <br /> Percent <br /> Plant Type Distribution Quantity <br /> Sea oats 80 % 125 , 600 24 4 <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> - - - - - _ _ - - _ _ _ _ _ _ <br /> Panic anic Grass U % 20 , 410 X 090 <br /> - - e P - - - <br /> Railroad Vine 4% 61280 1 1 <br /> Dune Sunflower 3 % 4 , 710 X99 <br /> Totals 100 % 157 , 000 29000 <br /> Item 17 : Technical Specifications — Section 30 . 4 Planting <br /> Section 30 . 4 is amended as follows : <br /> 30 . 4 Planting . Each planting area shall be clearly marked (flagged or staked ) prior to <br /> planting . No additional payment will be made to compensate for any additional <br /> plants installed on the outside of the planting zone . <br /> Planting shall be as prescribed on the Drawings except at locations seaward of <br /> existing seawalls where minimal fill is proposed as identified in the table below . <br /> Existing Seawalls without Plants <br /> Length <br /> (feet) Location <br /> 550 R-27 + 300 feet south to R- 27 + 850 feet south <br /> 750 R- 33 to R- 33 + 750 feet south <br /> 1 , 948 R- 37 + 625 feet south to R- 39 + 600 feet south <br /> The plants shall be installed 18 " on center in staggered shore-parallel rows 18 " <br /> apart . The holes dug shall be no less than 6 " deep for any plant species . In each <br /> hole , for each planting unit, a minimum of 8 oz . of pre -hydrated gel shall be <br /> added prior to plant installation so that the root ball , not the stems , is in contact <br /> with the gel . A pre -hydrating water gel , such as stockosorb , or equivalent, shall <br /> be used for all planting units per gel manufacturer specifications . Once the gel is <br /> added and plant installed the distance from the top of the root ball to the sand <br /> surface shall be no less than 4 " . Random site observations as to the planting <br /> depth will be included in the weekly monitoring . <br /> For each planting unit, slow release fertilizer shall be added to the gel prior to <br /> planting unit installation. A minimum of 2 grams of slow release fertilizer shall <br /> be included with each plant . The slow release (90 -day) pelletized Osmocote , or <br /> approved equivalent fertilizer shall have an N . P . K . ratio of 18 . 6 . 12 with trace <br /> elements . <br /> At the end of each work day all debris , trays , buckets , etc , must be removed from <br /> the working areas . CONTRACTOR shall provide the COUNTY with access to <br /> Page 8 of 26 <br /> March 16, 2010 <br />