My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-094A
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-094A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 10:38:12 AM
Creation date
10/1/2015 2:10:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/13/2010
Control Number
2010-094A
Agenda Item Number
8.C.1.
Entity Name
Ranger Construction
Subject
Sector 3 Beach & Dune Restoration Project
Change Order 1
Supplemental fields
SmeadsoftID
9644
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sector 3 Beach & Dene Restoration Project Attachment 1 to Chance Order No . 1 <br /> Item 3 : Technical Specifications — Section 1 . 6 Submittals Prior to Preconstruction Conference <br /> Section 1 . 6 is amended as follows : <br /> L6 Submittals Prior to Preconstruction Conference. SubsequefA to obt ., irffio <br /> ti COUNTY f the d FDEP and i TC A rr 13eR itS ) iv. itinto � i �Or1E bter the <br /> � v c n�—vcrir[rtio�o u � u � u �� r <br /> .tea .� . . � � .. � _. .� . 1 "" - '" FDEP ___ ._ _� - _ _ _ - i <br /> CONTTI? A ! D i4 l NT t ' t A eed� <br /> v�TrTT�1�'-1�72'�CrIG—'��'Y'tl�'Y�4�`tl'1'TCtIiGLJ .�C�CLTCTCCITiVCLCC—C�TCo cccC�c� <br /> other- r-equir-emef4s of these Speeinfiea+ions prior- to issuanee by the COUNTY o <br /> the Notiee to Pr-oeeed with nst ., , ,,tion within twenty (20) calendar days of <br /> after the FDEP date— of the pn ,ain ' Notice to Proceed, and prior to the <br /> preconstruction conference , the CONTRACTOR shall submit the following items <br /> in completed form for review by the COUNTY and the ENGINEER : <br /> (a) Letter Appointing Superintendent <br /> (b) List of Subcontractors <br /> (c) Hurricane and Severe Storm Plan <br /> (d) Traffic Control Plan <br /> (e) Accident Prevention Plan <br /> (f) Quality Control Plan <br /> (g) Environmental Protection Plan <br /> (h) Project Schedule <br /> Failure to comply with the above requirements within the time prescribed will be <br /> considered an event of default under the Contract . The letter of record will be <br /> written documenting all items discussed at the preconstruction conference ; the <br /> ENGINEER will furnish a copy to all in attendance . <br /> Item 4 : Technical Specifications — Section 5 . 1 General <br /> Section 5 . 1 is amended as follows : <br /> 5 . 1 General . Sand fill must meet the requirements cited in Table 2 of the Sediment <br /> QA- QC Plan , included by reference as Attachment 3 to these Specifications . <br /> Pfespeetive bidders shall submit the infeffnation identified in the Geeteehnieal <br /> Requifemef4s , . <br /> The <br /> " Construction. Access/ Staging Areas" identified on the Drawings are available to <br /> the CONTRACTOR for the storage of materials and equipment consistent with <br /> these Specifications . <br /> Item 5 : Technical Specifications — Section 5 . 2 Provide & Transport Fill <br /> Section 5 .2 is amended as follows : <br /> 5 .2 Provide & Transport Fill . The CONTRACTOR shall (a) excavate and provide <br /> suitable sand fill material from an acceptable upland source or multiple acceptable <br /> sand sources , and (b) transport .fill from the borrow area, deliver fill to the <br /> " Construction Access/ Staging Areas" and stockpile said fill in the " Stock Pile <br /> Area" — as shown on the Drawings . No overflow or spillage of fill shall be <br /> permitted during transport from the borrow area to the " Construction <br /> Access/ Staging Areas" . All trucks shall be covered in order to prevent spillage . <br /> if the CONTRACTOR fails to prevent spillage during transport, the <br /> Page 2 of 26 <br /> March 16, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.