My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-094A
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-094A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 10:38:12 AM
Creation date
10/1/2015 2:10:03 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sector 3 Beach & Dune Restoration Project Attachment I to Chanl;e Order No . I <br /> Item 13 : Technical Specifications — Section 25 . 1 Beach Tilling <br /> Section 25 . 1 is amended as follows : <br /> 25 . 1 The CONTRACTOR will till the beach at the discretion and only at written <br /> direction of the ENGINEER. The ENGINEER will base his decision regarding <br /> the need for tilling upon State requirements for beach fill compaction . If the <br /> CONTRACTOR is required to till the beach , he will be compensated in the <br /> amount indicated on the contract document for beach tilling . If tilling is not <br /> required, the amount of monies indicated as the tilling bi&contract amount in the <br /> bid document will be deducted from the total money due the CONTRACTOR . <br /> Item 14 : Technical Specifications — Section 26 Nighttime Operations <br /> Section 26 is amended as follows : <br /> 26 NIGHTTIME OPERATIONS <br /> Nighttime is that period defined as from dusk until dawn . Dicifinn nig t ifne operations <br /> the wor-k and eemply with all OSHA requirements . The CONTRACTOR shall shield e <br /> orient the lights to minifnize the amount of light that r-eaehes the tipland afea an. d e0n+P4-Y <br /> With 4 t lighting imposed by r�on:ni4 eo nd tions for- nor+ tui4le roteetion T� o <br /> _ _ _ _ _ __ _ _ _ _ _ <br /> CONTRACTOR shall notse so as t to distufb residents living along <br /> beaeh in the Pfojeet ai--ea. Beaeh dressing , gr-ading and tilling will be limited to da�4& <br /> JL. 0 LUl LLL V V L\. V V <br /> h o . 1 -lie CONTRACTOR <br /> .N 1 lJAC 1 I . Ll is strongly ene1111faged to-el_lndtiet rls muc 5•equife <br /> Gl-GCS 11.1 LIt L1 1. Ll1 Ull. LU <br /> b ti wer-k as <br /> possible dur- n „ ryr, yligNt hours oal�The CONTRACTOR shall not be <br /> limited in his operation at the upland sand mines by these Technical Specifications , but <br /> the CONTRACTOR shall comply with existing regulations and permits associated with <br /> operation of the upland mines As prescribed by the USFWS Biological Opinion dated <br /> 12/02/2009 (Page 6 of 58 ) the CONTRACTOR shall manage his operations so that <br /> " construction activities will onlytake ake place during_daylight hours " at the beach fill area . <br /> Page 6 of 26 <br /> March 16, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.