My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION — 104 - EROSION CONTROL AND TREATMENT OF DEWATERING WATER <br />AND STORMWATER FROM THE CONSTRUCTION SITE <br />PART 1 — GENERAL <br />1.1 SCOPE <br />A. This Section covers erosion control and the treatment of dewatering water and storniwater <br />runoff from the construction site and work area. The pollution control measures shall <br />prevent turbid or otherwise polluted waters from being discharged from the construction <br />site or work area, to undeveloped portions of the site or off-site <br />B. The OWNER considers pollution from dewatering water and stormwater runoff from a <br />construction site or work area to be a very serious offense. The CONTRACTOR is <br />solely responsible for preventing pollution caused by dewatering water and stormwater <br />runoff from the construction site or work area. <br />C. The pollution control measures specified herein represent minimum standards to be <br />adhered to by the CONTRACTOR throughout the Project's construction. The OWNER <br />reserves the right to require the CONTRACTOR to employ additional pollution control <br />measures, when in the sole opinion of the OWNER, they are warranted. If site specific <br />conditions require additional erosion and stormwater pollution control measures during any <br />phase of construction or operation to prevent erosion or to control sediment or other <br />pollution, beyond those specified in the Drawings or herein, implement additional best <br />management practices as necessary, in accordance with Chapter 4, "Best Management <br />Practices for Erosion and Sedimentation Control' of the Florida Erosion and Sediment <br />Control Inspector's Manual, and other references as may be required by regulatory <br />permits. (http.//www.dep.state.fl.us./water/nonpoint/docs/erosion/erosion-inspectors- <br />manual.pdf) <br />D. The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br />Section. Alternatively, the OWNER may halt the CONTRACTOR's operations until the <br />CONTRACTOR is in full compliance with this Section. If the OWNER halts the <br />CONTRACTOR's work as a result of its failure to comply with this Section, the Construction <br />Contract time clock will continue to run. <br />E In addition to these Specifications comply with Chapter 4 - "Best Management Practices <br />for Erosion and Sedimentation Control" and Chapter 5 — Best Management Practices for <br />Dewatering' of the Florida Erosion and Sediment Control Inspector's Manual. In the event <br />of a conflict between the referenced Chapters and these Specifications, the more stringent <br />requirement shall prevail. <br />1.2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br />A. The OWNER has obtained certain permits for. this project and they are listed in <br />paragraph SC -6.08 of the Supplementary Conditions. Per paragraph SC -6.08.0 of the <br />Supplementary Conditions, the CONTRACTOR shall apply for, obtain and pay for all <br />other required permits licenses, sampling and tests. Permits the CONTRACTOR may <br />need to secure may include but not be limited to: <br />1. Long-term and/or short-term dewatering permit as required by the St. Johns <br />01025 4 Technical Specifications - Addendum 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US1 to 17th St\Admim\bid <br />documents\Addendum #1\Technical Specifications Add 1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.