My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Water Management District (SJRWMD). Generally, only the short-term <br />permit is required. Contact SJRWMD at (321) 984-4940 to determine which <br />permit is required and the associated statutory requirements; <br />2. SJRWMD RDS -50 Permit (required)* <br />3. The State of Florida Generic Permit for Stormwater Discharge From Large <br />and Small Construction Activities (required). Contact the Florida Department <br />of Environmental Protection (FDEP) at (866) 336-6312 (toll free) or (850) <br />245-7522 or www.dep.state.fl.us/water/stormwater/npdes/ <br />4. FDEP's Uncontaminated Groundwater Release Permit (required if <br />dewatering occurs). This permit requires water quality testing by a State <br />certified laboratory. <br />B. Provide copies of all permits to the OWNER and ENGINEER and comply with all conditions <br />contained in all permits at no extra cost to the OWNER If there is a conflict between any <br />permit requirement and these Specifications, the more stringent specification or <br />requirement shall govern. <br />C. In addition to paying for all permit fees CONTRACTOR shall also pay for all water quality <br />sampling and laboratory tests required by any permit. <br />1.3 GENERAL <br />A. Do not begin any other construction work until the pollution control and treatment <br />system has been constructed in accordance with approved plans and permits and <br />approved for use by the OWNER and applicable permitting authorities. <br />B. From time to time, the OWNER or ENGINEER will inspect the pollution control and <br />treatment system and may take effluent samples for analysis by a testing laboratory <br />selected and paid for by the OWNER If at any time, the OWNER or ENGINEER <br />determines that the pollution control and treatment system is not in compliance with <br />the approved system, the OWNER or ENGINEER will shut the portion of the project <br />down that is not in compliance, and it shall remain shut -down until the pollution control <br />and treatment system is properly constructed or repaired, and complies with the <br />approved pollution control and treatment system plans and specifications. <br />C. Schedule construction to minimize erosion and stormwater runoff from the construction <br />site. Implement erosion control measures on disturbed areas as soon as practicable in <br />portions of the site where construction activities have temporarily or permanently <br />ceased, but in no case more than 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased. In addition to other temporary erosion <br />control measures that may be implemented, application of polyacrylamide is required <br />o n all such disturbed areas within 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased, unless final landscaping has been <br />installed. Polyacrylamide application shall be as specified herein. <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />e vent. Clean and maintain each pollution control system as required by its <br />manufacturer or the OWNER, until the system is no longer needed. If a water quality <br />✓ iolation occurs, immediately cease all work contributing to the water quality violation <br />and correct the problem. <br />01025-5 Technical Specifications - Addendum 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US1 to 17th St\Admim\bid <br />documents\Addendum #1\Technical Specifications Add 1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.