My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-009A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-009A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 10:57:17 AM
Creation date
10/1/2015 5:56:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/04/2014
Control Number
2014-009A
Agenda Item Number
8.K
Entity Name
Ranger Construction Industries, Inc of Fort Pierce
Subject
Indian River Boulevard Resurfacing
Area
U S 1 to 17th Street
Project Number
1302
Bid Number
2014009
Supplemental fields
SmeadsoftID
12991
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E Discharge shall not violate State or local water quality standards in the receiving <br />waters, nor cause injury to the public health or to public or private property, nor to the <br />Work completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER <br />F. Promptly repair all damage at no cost to the OWNER <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340. <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR INSTALLATION, AND MAINTENANCE <br />A. State Certified Erosion Control Specialty Subcontractor is Required for Installation and <br />Maintenance: Installation and maintenance of all erosion and stormwater pollution <br />control devices, shall be by a State Certified erosion control subcontractor who <br />specializes in the installation and maintenance of such devices. After installation, this <br />specialty subcontractor shall maintain the erosion and stormwater pollution control <br />devices until in the ENGINEER's sole opinion, the devices are no longer necessary <br />(such time not to extend past the date the OWNER formally accepts the project as <br />complete). Before beginning construction, submit to Indian River County for review <br />and approval, a Stormwater Pollution Prevention Plan (SWPPP), prepared by the <br />certified erosion control subcontractor. Construction shall not begin until the SWPPP <br />has been approved by Indian River County Submit the approved SWPPP to the <br />ENGINEER before beginning construction. Include in the SWPPP, the "Contractor's <br />Affidavit Regarding Erosion Control and Treatment of Dewatering Water and <br />Stormwater From the Construction Site" (located at the end of this Section). <br />1.6 "POLLUTION" AND CERTAIN UNCONTESTABLE POLLUTION EVENTS DEFINED <br />A. With respect to this Section and as may be further defined in paragraphs 1.6.B, 1.6.C, <br />and 1.6 D, "pollution" is the presence in off-site waters of any substances, <br />contaminants, or manmade or human -induced impairment of off-site waters or <br />alteration of the chemical, physical, biological, or radiological integrity of off-site water <br />in quantities or at levels which are or may be potentially harmful or injurious to human <br />health or welfare, animal or plant life, or property. Pollutants to be removed include but <br />are not limited to, sediment and suspended solids, solid and sanitary wastes, <br />phosphorus, nitrogen pesticides, oil and grease, concrete truck washout, stucco mixer <br />washout, curb machine washout washout from other construction equipment, <br />construction chemicals, and construction debris. <br />B. When the Discharge is Directly Into an Existing Water Body, Pollution Occurs When.. <br />An existing water body (includingditches and canals) is defined to be polluted by the <br />CONTRACTOR's operations when at any time, the turbidity of the water immediately <br />downstream of the CONTRACTOR's discharge point(s) is at least 29 nephelometric <br />turbidity units (NTUs) higher than the turbidity of the background water upstream of the <br />01025-6 Technical Specifications - Addendum 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1302-IR Blvd Resurfacing (SCOP) US1 to 17th St\Admim\bid <br />documents\Addendum #1\Technical Specifications Add 1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.