Laserfiche WebLink
Mr. Scott McCallister January 25 , 2012 <br /> Republic Services Inc . 3 1323-82527 <br /> ■ The existing pneumatic pump in the existing sump will be re-used and installed in the <br /> proposed new condensate sump . Where references and details on the drawings refer to <br /> electrical components , those items will be converted to pneumatic . <br /> ■ The standby electrical generator will be furnished and delivered to the site by the County. <br /> If the generator is delivered while the contractor is onsite then the contractor will offload <br /> the generator at the County' s direction . No foundation or electrical connection to support <br /> this generator has been included ; <br /> t The new condensate sump is a single wall structure and is not a dual contained system ; <br /> ■ The dual contained HDPE condensate pipes will be installed using the slip lining method ; <br /> ■ The electrical control panel at the existing flare station will be reinstalled and reused at <br /> the new flare station location . <br /> Golder looks forward to working with Republic on this important and time sensitive project, and we trust <br /> that our proposal is responsive to your needs . If you need any additional clarification regarding <br /> our <br /> submittal , please contact David Knapp at your convenience . <br /> G4Gae <br /> . <br /> J . &miCe G <br /> Snsultant Principal and Co struction Division Leader <br /> cc - Geosyntec <br /> J . Hartings - Republic <br /> T . Westover — Republic <br /> Attachments Engineer' s Estimate Form <br /> JDK/kds <br /> FN : G :\Proposals\P23\P23-82527\Indian River Proposal_1 .docx <br /> -� Go i r <br /> Indian River Proposal_( MJD). docx hates <br />