My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-018A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-018A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 12:31:45 PM
Creation date
10/1/2015 3:57:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
02/07/2012
Control Number
2012-018A
Agenda Item Number
12.J.3
Entity Name
Republic Services of Florida
Subject
Solid Waste Operations & Maintenance First Amendment to Contract Agree.
Class 1 landfill
Area
1325 74th Ave.
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10865
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID WORKSHEET <br /> SOLID WASTE DISPOSAL DISTRICT <br /> INDIAN RIVER COUNTY LANDFILL <br /> GAS FLARE STATION RELOCATION <br /> Revision 1, 01 -31 - 2012 <br /> Estimated <br /> Item Work Description/Item Units Quantity (Note Item Unit Cost Total Cost <br /> No . X) <br /> General Site Preparation <br /> 1 Mobilization and Demobiliation ( See Note 1 ) LumpSum 1 $ 165000 . 00 $ 16, 000 . 00 <br /> 2 Surveying (See Note 11 ) Lump Sum 1 $ 8 , 800 . 00 $ 85800 . 00 <br /> 3 Site Preparation for Relocation ( See Note 111 ) Lump Sum 1 $4 ,000 . 00 $4 , 000 . 00 <br /> Subtotal General Site Preparation $28,800. 00 <br /> Gas Flare Relocation <br /> 4 Demolition/Removal ( See Note IV ) Lump Sum 1 $ 18 , 000 . 00 $ 18 , 000 . 00 <br /> 5 Flare Skid Relocation <br /> EjB . Condcnsate <br /> Crane & Flatbed Rental and Mob/Demob LumpSum 1 $3 , 800 . 00 $3 , 800 . 00 <br /> Sump Removal and Pum Relocation Lump Sum 1 $ 5 , 000 . 00 $ 5 ,000 . 00 <br /> Flare System Start- up at New Location ( See Note V) Lump Sum 1 $ 7 ,000 . 00 $ 7 , 000 . 00 <br /> Subtotal Gas Flare Relocation $335800. 00 <br /> Gas Collection System Relocation and Expansion <br /> 6 HDPE piping (w/excavation and backfill ) <br /> A Relocate 18 - in . HDPE header, 2 - in . air main , 2 - in . condensate feet 110 $ 50 . 00 $ 5 , 500 . 00 <br /> forcemain <br /> B . 24- in . HDPE SDR 17 header feet 570 $ 100 . 00 $ 57 ,000 . 00 <br /> C . 6- in , HDPE SDR 17 lateral feet 675 $24 . 00 $ 16 ,200 . 00 <br /> D . Weld Caps for 6 - in . laterals abandoned in- place each 3 $200 . 00 1 $600 . 00 <br /> 7 JHDPE Valves and Fittings <br /> A . Meader Access Riser (North of access road ) each 1 $35500 . 00 $3 , 500 . 00 <br /> B . Underground Control Valve for 18 - in . header each 1 $4, 500 . 00 $4 , 500 . 00 <br /> C . Underground Control Valve for 6- in . lateral each 1 $2 , 000 . 00 $25000 . 00 <br /> D . 24 - in . to 18- in . Reducer connection each 1 $45800 . 00 $4 , 800 . 00 <br /> E. 24 - in . I IDPE SDR 17 elbow each 3 $2 , 500 . 00 $ 7 , 500 . 00 <br /> F . 2 - in . HDPE SDR 9 air line elbow each 3 $ 500 . 00 $ 1 , 500 . 00 <br /> G . 2 - in . HDPE SDR 9 condensate force main elbow each 2 $ 1 , 000 . 00 $2 , 000 . 00 <br /> IL 1 - in . HDPE SDR 9 condensate force main elbow each 5 $700 . 00 $ 3 , 500 . 00 <br /> I . 6 -in . HDPE SDR 17 tee each 2 1 $ 900 . 00 $ 15800 . 00 <br /> J . 16win . HDPE SDR 17 elbow each 1 $ 1 ,000 . 00 $ 1 ,000 . 00 <br /> 8 Liquid Collection <br /> A . 48 - in . dia. HDPE SDR 21 condensate sump (See Note VI ) each 1 $45 ,000 . 00 $45 , 000 . 00 <br /> B . Pneumatic or Electric Pump in the sum (See Note V11 ) each 1 $2 , 500 . 00 $2 , 500 . 00 <br /> C . 2 - in . HDPE SDR 9 air line ( in header pipe trench ) feet 570 $ 12 . 50 $ 7 , 125 . 00 <br /> D 2- in . HDPE SDR 9 condensate force main (in header pipe feet 250 $ 23 . 50 $ 5 , 875 . 00 <br /> trench ) <br /> E I - in . HDPE SDR 9 condensate force main within 2 - in . HDPE feet 530 $ 16 . 00 $ 8 ,480 . 00 <br /> SUR 9 (in header pipe trench ) <br /> 9 Earthwork <br /> 2Bq <br /> ffSand <br /> rading at new flare location e d 750 $ 15 . 00 $ 11 , 250 . 00 <br /> . n for condesnate sum north of access road c d 20 $ 30 . 00 $ 600 . 00 <br /> ckfill under road crossing rt <br /> 3 225 $ 1 .00 $225 . 00 <br /> Subtotal Gas Collection System Relocation and Expansion $ 192 ,455.00 <br /> Miscellaneous <br />
The URL can be used to link to this page
Your browser does not support the video tag.