Laserfiche WebLink
BID WORKSHEET <br /> SOLID WASTE DISPOSAL DISTRICT <br /> INDIAN RIVER COUNTY LANDFILL <br /> GAS FLARE STATION RELOCATION <br /> Revision 1 , 01 -31 -2012 <br /> 10 Miscellaneous Items <br /> A . Standby Diesel Generator (Only installation See Note VIII ) Lump Sum 1 $ 100 . 00 $ 1 ,000 . 00 <br /> B . Conduit for burying electrical lines (cut and backfill ) feet 1500 $2 . 00 $35000 . 00 <br /> C Electrical connection to condensate knock out sump north of each 1 $6 ,000 . 00 $6 ,000 . 00 <br /> access road ( See Note IX ) <br /> D . 6 - in . thick crushed stone bedding at flare c d 40 $60 . 00 $2 , 400 . 00 <br /> E . 8-oz Geotextile separator sq . yd . 200 $3 . 00 $ 600 . 00 <br /> F . 6- mil Vapor barrier layer sq . yd . 200 $0 . 60 $ 120 . 00 <br /> G . Identification marker in trenches feet 795 $0 . 60 $477 . 00 <br /> H . 36 - in . CMP casing for header road crossing feet 25 $ 120 . 00 $ 3 , 000 . 00 <br /> L Cast-in-place reinforced concrete slab cyd 73 $465 . 00 $33 ,945 . 00 <br /> 4 - in thick Asphalt Concrete surface and 4- in . thick gravel ft 70 $30 . 00 $2 , 100 . 00 <br /> base at header road crossing <br /> K . Vegetation for disturbed areas on landfill sq . yd . 1500 $2 .40 $35600 . 00 <br /> L . 8 - in . Millings at flare entrance sq . yd . 250 $ 8 . 00 $2 , 000 . 00 <br /> M . Shed near the flare ( 10' x 12 ') each 1 $ 1 ,200 . 00 $ 1 , 200 . 00 <br /> N . Fence feet 230 $ 22 . 00 $ 5 , 060 . 00 <br /> Subtotal Miscellaneous $64 ,502 . 00 <br /> TOTAL $3195557.00 <br /> Notes <br /> I Mobilization/Demobilization ( Item I ) shall include any partial demobilization required for all components of construction specified <br /> herein and in the <br /> II The survey activities ( Item 2 ) shall include surveying for all pipe alignment, initial and final survey and any surveying needed throughout <br />the duration of the <br /> "Hie Site Preparation activities ( Item 3) shall include clearing, grubbing, stripping, and surface grading for areas in header alignment and the flare <br /> relocation area and shall involve all material , <br /> III equipment and labor required for ( i) shutting the flare off; ( it) lowering the flare stack ; (iii) switching off and disconnecting electrical <br />[nits/components and turning offal] valves; (iv ) <br /> disconnecting air compressor from the 2 -in . air line; (v) disassembling 14-in . header flanged connection to knock out pot on flare; (vi) cutting <br /> off the condensate drain from knock out pot at <br /> flare to condensate sump near flare; (vii) securing loose equipment on the flare skid ; and (viii) miscellaneous preparations as necessary for relocation <br /> of the skid. <br /> Demolition activities shall include demolition/removal of ( i) concrete pad; ( ii ) gravel bed and fence; (iii) — 200 ft. of I -in. HDPE condensate <br /> force main ; (iv) —330 ft. of 14-in . HDPE header <br /> IV <br /> pipe; (v ) 18-in. to 14-in . reducer; (vi ) — 230 ft. of 2 -in . I IDPH air main ; (vii) CMP casing for an main under roadway near Flare; <br /> (viii) backfill after all pipe removal . <br /> The flare start-up shall include (i ) installing electric wiring, (ii) providing header reconnection ; (iii ) repositioning all the units/components on <br /> the flare station after relocation; ( iv) raising the <br /> V flare stack; (v) ensuring operation of all components including blowers, compressor, dryer, knock-out pot, condensate sump and pumps ; and (vi) ensuring <br /> the entire utility flare system <br /> functions smoothly. <br /> Item 8A shall incude cost associated with (i) 48-in . dia. HDPE 10' condensate sump ; (ii) two 24 -in , flanged connections for the header inlet <br /> and outlet; and (iii ) <br /> VI components and fittings required for the installation of the sump. <br /> Contractor to use the type of pump (pneumatic pump or electric pump) only after discussion with and approval from the Engineer and/or Owner. If existing <br /> pneumatic pump is used this item <br /> II may not be required . <br /> VIII County purchased generator set shall be offloaded on-site and installed by the contractor on the flare pad. <br /> IN Item IOC may not be required if a pneumatic pump is used in the condensate sump. <br /> N Quantities presented herein are estimated quantities and should be verified by Contractor. If quantities are found to be significantly different <br />, Contractor shall notify Construction Manager. <br /> Quantities not provided shall be estimated and verified by Contractor. Payment shall be made on surveyed and calculated quantities in accordance <br /> with the Technical Specifications . <br />