My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-066
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 3:03:25 PM
Creation date
10/1/2015 2:05:03 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(i) Traffic Impact Statement or Analysis as required by IRC Traffic Engineering . <br /> ( ii) Stormwater management calculations and hydraulic and hydrological modeling of <br /> the on - site drainage basin (s ) and adjacent off- site drainage basins impacted by the <br /> development . <br /> 3 . The CONSULTANT shall prepare an updated detailed site and building construction plan <br /> cost estimate , based on the preliminary Design Documents , and reconcile design with <br /> project budget. <br /> (c) PHASE 3 - FINAL DESIGN AND PERMITTING PHASE <br /> 1 . The CONSULTANT will perform all necessary surveying, civil engineering, architectural , <br /> mechanical and electrical engineering and structural design, and incidental work for the site <br /> and Buildings . Based on the preliminary design development documents , final construction <br /> plans and technical specifications shall be prepared , establishing in detail the material and <br /> systems required for the project, including the incorporation of Sustainable building and <br /> site design principles and systems . <br /> 2 . The CONSULTANT shall Design and prepare a complete set of construction plans for the <br /> two buildings suitable for obtaining County Site Plan Approval , Building Permits , and <br /> Health Department permits , and other permits required for the work. The design shall be in <br /> accordance with the 2004 Florida Building Code and current Life Safety Code . These plans <br /> shall include : <br /> (i ) Architectural <br /> (ii) Structural <br /> ( iii) Mechanical <br /> (iv) Electrical <br /> (v) Interior design / finishes / furnishings & furniture selection <br /> (vi ) Equipment and Machinery evaluation and general specification <br /> (vii) Fire protection systems <br /> (viii) Security systems <br /> (ix) Information technology systems <br /> a. Security requirements and coordination <br /> b . Voice and data systems <br /> (x) Energy Code Calculations/ modeling per Florida Building Code (F . B . C . ) . <br /> 3 . The CONSULTANT shall design and prepare a complete set of site construction plans for <br /> obtaining County site plan approval , building permits , and other site development <br /> jurisdictional agency permits . These plans shall include : <br /> (i ) Site Plan <br /> ( ii) Landscape / Irrigation design — "Florida Friendly" design <br /> (iii) Site Electrical / site lighting <br /> (iv) Clearing, Earthwork, drainage and paving <br /> a . On- site <br /> b . Off- site — (Elections , Emergency Management Services and Public Works sites) <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.