Laserfiche WebLink
Exhibit 1 <br /> (Scope of Work) <br /> WORK ORDER NO, 1 <br /> Project Description <br /> The proposed project includes the extension of the IRC Master Planned 12 " Re- Use Water Main , <br /> storage tanks , pumping station ( s ) and distribution network to provide irrigation quality re - claimed <br /> water ( Re- Use Water) for the North Indian River County barrier island vicinity, including the <br /> irrigation water needs of the Town of Indian River Shores . <br /> Scope of Services <br /> Schulke , Bittle & Stoddard , L . L . C . will provide services including surveying ; geotechnical <br /> exploration ; engineering design and hydraulic analysis/model of the Master Planned 12 " Re- Use <br /> Water Main , storage tanks, pumping station and distribution network needed to supply re- use <br /> water for the North Indian River County barrier island vicinity ; preparation of Construction <br /> Plans ; preparation and submittal of permit applications ; construction administration and periodic <br /> construction field inspection for the proposed project that will provide for the construction of <br /> approximately 12 , 720 if of 12 " P . V . C . and H . D . P . E . Master Planned Re- Use Water Main , <br /> storage tank( s), pump station , and associated appurtenances, more particularly described as <br /> follows : <br /> - Connection to be made to a 16" PVC Re - Use/ reclaimed water main at the <br /> intersection of CR510 and SR-A - 1 -A . This existing re- use water main was recently <br /> constructed from the mainland, crossing the Indian River Lagoon, and along CR510 <br /> to SR A - 1 -A , and transmits re- use water from the Central and West Regional WWTP. <br /> - On SR A - 1 -A, the re- use main will run south4415 If from CR510 to the inactive <br /> North County WWTP located within the Sea Oaks Development . Along this length <br /> of re- use main , 2 ", 4 " or 6" PVC or HDPE stub- outs with valves will be provided at <br /> strategic locations for the for future connection and distribution of re- use water to <br /> irrigation systems for the following developments : <br /> - Disney Resort(east and west) <br /> - North Shore Club S/D <br /> - Coral stone <br /> - Bermuda Club <br /> - Sea Oaks <br /> The existing inactive WWTP at the Sea Oaks development may need to be <br /> retrofitted , converting the existing WWTP concrete storage and holding structures to <br /> re-use water storage structures . A new pumping station may also need to be <br /> constructed on this site to provide additional flow capacity and boost pressure . The <br /> need for the WWTP retrofit and new pump station is likely. However, detailed <br /> engineering analysis and modeling will be completed as part of this project, to <br /> determine whether these improvements are needed. <br /> P . 1 of 3 <br />