My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-255
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 2:29:15 PM
Creation date
10/1/2015 3:07:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/13/2011
Control Number
2011-255
Agenda Item Number
12.J.1
Entity Name
Schulke Bittle Stoddard
Subject
Work Order No.1
North Barrier Island reclaimed water Distribution System
Area
South of SR 510
Supplemental fields
SmeadsoftID
10410
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 <br /> (Scope of Work) <br /> WORK ORDER NO, 1 <br /> Phase 2 — Final design and Permitting : <br /> -Obtain geotechnical data — soil borings along the route of the main , and at select locations where <br /> improvements may be proposed . <br /> - Excavation for field verification of actual locations of existing underground utilities and <br /> structures (" <br /> pot holing"), if required . For fee estimating purposes, twenty (20 ) "pot holed" <br /> locations are assumed . SBS will retain a licensed utility contractor for this work . <br /> - Survey of "pot holed " utilities, if required . <br /> - Survey of Sea Oaks W WTP, if required . <br /> - Prepare detailed construction plans and specifications of proposed system improvements . <br /> - Prepare and submit permit applications to jurisdictional agencies , including but not limited to : <br /> FDEP, FDOT, SJRWMD, IRC Engineering , <br /> Phase 3 — Procurement and Construction : <br /> - Prepare contract Bid documents ; assist IRCDUS in procurement and bid evaluation process . <br /> - Provide construction administration and periodic construction field inspections during the <br /> construction of the improvements . <br /> See Exhibit "A " for location map and conceptual plan, and Exhibit "B " for construction <br /> cost estimate. <br /> The estimated construction cost of this project is $ 2 ,074 ,651 . 12 <br /> In connection with this project, Indian River County will provide the Engineer with a copy of any <br /> pertinent preliminary data or reports, all available drawings in electronic AutoCadd format; all <br /> surveys , maps , record drawings and design drawings and other documentation in the possession <br /> of or reasonably available to the County that are pertinent to the project. <br /> In order to execute this project in the most cost effective manner with the most aggressive <br /> schedule , Schulke , Bittle & Stoddard , L . L . C . is using the following sub -consultants : <br /> • Houston , Schulke, Bittle & Stoddard , Inc . DBA Meridian Land Surveyors - for <br /> the route and boundary survey( s) . <br /> • KSM Engineering & Testing, Inc . for soil boring / Geotechnical Evaluation . <br /> • Josan Construction — to pot hole existing utilities <br /> Services not included in this scope of services are : <br /> • Any services associated with assisting Indian River County in review and <br /> evaluation of patent related disputes , issues , or claims including preparing to <br /> serve or serving as a consultant or witness for Indian River County in litigation , <br /> arbitration , public or private hearings , or other legal administrative proceedings <br /> involving patent related disputes, issues or claims . <br /> • Any services in connection with the project not otherwise provided for in this <br /> scope of services . <br /> P . 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.