My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-214
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:37:57 AM
Creation date
10/1/2015 4:47:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/04/2012
Control Number
2012-214
Agenda Item Number
12.J.1
Entity Name
Schulke, Bittle and Stoddard, LLC
Subject
Work Order No.2 water and sewer mains proposed drainage
Area
US 1 South of 11th Street SW
Supplemental fields
SmeadsoftID
11608
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35 PROPOSED FORCE MAIN 4" 620+00.00 STUB-OUT FORCE MAIN 4" WITH VALVES EACH SIDE OF <br /> PAVEMENT $12s000.00 <br /> 36A FORCE MAIN 10" PVC - STRUCTURE No.? 621 +35 RT LOCATE & POTHOLE - OFFSET F.M. UNDER PROPOSED <br /> (LONG DEFLECTION) DRAINAGE STRUCTURE $29s620,00 <br /> 36B WATER MAIN 12" PVC 621 +35 <br /> $365500.00 <br /> 37 FIRE HYDRANT ASSEMBLY 622+60 RT RELOCATE & RESET FHA WITH 8"PVC & VALVES FOR <br /> FUTURE WATER SRVICE STUB-OUT $7,500.00 <br /> 38 PROPOSED WATER MAIN 8" 624+00.00 STUB-OUT WATER MAIN 8" WITH VALVES EACH SIDE OF <br /> PAVEMENT & FHA ON WEST END OF PIPE $26,300,00 <br /> 39 PROPOSED FORCE MAIN 4" 625+80 STUB-OUT FORCE MAIN 4" WITH VALVES EACH SIDE OF <br /> PAVEMENT <br /> $12,000.00 <br /> 40 WATER MAIN 1Y PVC - STRUCTURE No.? 826+30 RT LOCATE & POTHOLE - OFFSET W.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE <br /> $36500,00 <br /> 41 FORCE MAIN 10" PVC - STRUCTURE No.? 626+30 RT LOCATE & POTHOLE - DIRECETIONAL BORE w (120'+/-) <br /> UNDER PROPOSED DRAINAGE STRUCTURE $220500.00 <br /> 42 FIRE HYDRANT ASSEMBLY 628+20 RT FHA MAY BE WITHIN CLEAR ZONE. RELOCATE NORTH 200', EAST OF <br /> SIDEWALK & ADJUST HEIGHT TO FINISH GRADE E1 <br /> $7,500,00 <br /> 43 WATER MAIN 8" PVC - 7RUNKLINE DRAINAGE 828+45 LOCATE & POTHOLE - OFFSET F.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE <br /> $200300,00 <br /> 44 WATER MAIN 8" PVC - STRUCTURE No.? 629+80 LT LOCATE & POTHOLE - OFFSET W.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE <br /> $24000.00 <br /> 45 WATER MAIN 12" PVC - STRUCTURE No.? 629+80 RT LOCATE & POTHOLE - OFFSET W.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE $36 5D0 00 <br /> 46 FORCE MAIN 16" PVC STRUCTURE No.? 629+80 RT LOCATE & POTHOLE - OFFSET F.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE <br /> $400500,00 <br /> SUBTOTAL <br /> $311 ,720,00 <br /> 40F7 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.