Laserfiche WebLink
23 PROPOSED FORCE MAIN 4' 609+00.00 STUB-OUT FORCE MAIN 4' WITH VALVES EACH SIDE OF <br /> PAVEMENT $12,000.00 <br /> 24 FORCE MAIN 10" PVC - 5-403 608+OS RT LOCATE & POTHOLE - OFFSET F.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE <br /> $22 500.00 <br /> 25 WATER MAIN 12' PVC - 6-403 609+10 RT LOCATE & POTHOLE - OFFSET W.M. UNDER PROPOSED _ <br /> DRAINAGE STRUCTURE - $36,500.00 <br /> 26 FORCE MAIN 10" PVC - CD-04 BOX CULVERT 609+60 RT LOCATE & POTHOLE - OFFSET F.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE $0.00 NO CONFLICT <br /> 27 WATER MAIN 12" PVC - CD-04 BOX CULVERT 609+60 RT LOCATE & POTHOLE - OFFSET W.M. UNDER PROPOSED <br /> ORAINAGE.STRUCTURE $0,00 NO CONFLICT <br /> 28 FORCE MAIN 10" PVC - STRUCTURE No.? 610+55 RT LOCATE & POTHOLE - OFFSET F.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE <br /> $22,500.00 <br /> 29 WATER MAIN 12" PVC - STRUCTURE No.? 610+55 RT LOCATE & POTHOLE - OFFSET W.M. UNDER PROPOSED - <br /> DRAINAGE STRUCTURE <br /> $36,500.00 <br /> 30 FIRE HYDRANT ASSEMBLY 612+05 RT RELOCATE & RESET FHA WITH 8"PVC, VALVES FUTURE <br /> WATER SRVICE STUB-OUT $715W.00 7? <br /> 31 PROPOSED WATER MAINS" 614+00,00 RELOCATE & RESET FHA WITH 8'PVC & VALVES FOR <br /> FUTURE WATER SRVICE STU"UT <br /> $26,300,00 <br /> 32 WATER MAIN 12" PVC - STRUCTURE No.? 615+58 RT LOCATE & POTHOLE - OFFSET W.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE <br /> $36s500,00 <br /> 33 FORCE MAIN 10" PVC - STRUCTURE No.? 615+58 RT LOCATE & POTHOLE - OFFSET F.M. UNDER PROPOSED <br /> DRAINAGE STRUCTURE <br /> $229500,00 <br /> 34 FIRE HYDRANT ASSEMBLY 818+90 RT RELOCATE & RESET FHA WITH 8"PVC & VALVES FOR <br /> FUTURE WATER SRVICE STUB-OUT <br /> $7,500.00 <br /> SUBTOTAL <br /> $230P300.001 <br /> 3OF7 <br /> i <br />