My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-214
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:37:57 AM
Creation date
10/1/2015 4:47:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/04/2012
Control Number
2012-214
Agenda Item Number
12.J.1
Entity Name
Schulke, Bittle and Stoddard, LLC
Subject
Work Order No.2 water and sewer mains proposed drainage
Area
US 1 South of 11th Street SW
Supplemental fields
SmeadsoftID
11608
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Surveying of US 1 right-of-way. A base survey map to be provided by IRC (from the <br /> FDOT and its consultants). <br /> • Pot-holing, surveying and / or field locating existing, IRCDUS utilities, or facilities <br /> and infrastructure of other utility providers. Pursuant to our discussions during a <br /> preliminary design meeting with MOT consultants, the FDOT and its consultants <br /> are providing accurate locations and elevations of all IRCDUS utilities and other <br /> utilities at all conflict locations. <br /> In order to execute this project in the most cost effective manner with the most aggressive schedule, <br /> Schulke, Bittle & Stoddard, L.L .C . is relying on survey and design data provided by MOT design <br /> consultants (digital AutoCADD format) in order to prepare it' s deliverables (utility construction plans <br /> in AutoCadd format as well as signed and sealed construction drawings) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.