My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-136
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 10:26:39 AM
Creation date
10/1/2015 2:40:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
06/14/2011
Control Number
2011-136
Agenda Item Number
12.J.2
Entity Name
Schulke,Bittle and Stoddard
Subject
53rd Street 12" master planned water main extensions
Amendment No.1 to Work Order No. 9
Area
53rd. Street
Supplemental fields
SmeadsoftID
9985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' EXHIBIT I — SCOPE OF WORK <br /> To <br /> Amendment 1 <br /> To <br /> Work Order Number 9 <br /> 53r`t Street 1. 2 " Master Planned Water Main Extensions <br /> Project Description <br /> The proposed project will provide engineering design and permitting for the construction of new 12 ' " <br /> Master Planned Water Main extensions on 53 "1 St . and Old Dixie Highway , and provide for the <br /> necessary Utility modifications to existing water mains , sewer mains and non - potable re- use water <br /> mains lying within or adjacent to 53 "1 St. and Old Dixie Highway . The work is beim completed in <br /> conjunction with the IRC Public Works department ' s proposed contract plans , " 53 " St. Roadway <br /> Improvements" , " Phase I " and " Phase II ", COUnty project No . 0107 , including : <br /> - Phase I : 53 "1 St. Roadway Improvements from Lateral ` H ' canal to the Florida East Coast <br /> Railroad , County project no . 0107 , Phase <br /> - Phase IL 53 "1 St. Improvements from the Florida East Coast Railroad to Indian River Blvd , <br /> County project no . 0107 , Phase II . (This also includes improvements to Old Dixie Hwy) . <br /> Within Phase I limits , the work will include : EngineerinY design and permitting for the construction of <br /> a new 12 " Master Planned Water Main extension on 53 " St. , from the west side of Lateral FI canal , <br /> east for 1421 If; and ending approximately 750 If west of the FEC Railroad ; and provide for the <br /> necessary utility modifications to existing water mains , sewer mains and non - potable re- use water <br /> mains lying within or adjacent to 53 "r St . from Lateral H canal to the FEC railroad ; and provide <br /> necessary water main , sewer main , and re-claimed non - potable main " stub -outs " to serve future <br /> IRCDUS customers . <br /> "File new water main extension is necessary to provide an interconnection and loop between two <br /> water distribution sub- systems , one primarily serving the USI corridor, and the other primarily <br /> serving the 58 ' x' Ave service area. The constrUction is necessary at this time so that it is completed <br /> prior to or in conjunction with the 53 "1 St . improvements , which construction would otherwise be <br /> considerably more expensive and difficult if proposed after the paving and drainage <br /> improvements were completed <br /> Modifications to existing utilities are necessary to avoid conflicts with paving and drainage <br /> improvements to 53 ' d St . proposed by the Indian River County Public Works and Engineering <br /> departments . The modifications generally consist of removing and replacing portions of the utility <br /> mains with new utility mains that have been deflected below or to the side of the location of <br /> proposed drainage inlets , pipes , or other roadway infrastructure improvements . <br /> The "stub - outs" are necessary to provide accessible locations that are extended outside ofthe new <br /> roadway improvements proposed on 53 "1 St. , making future connections and extensions of the <br /> existing utilities possible with -out damaging the new paved road . <br /> Within Phase II limits , the work will include : Engineering design and permitting for the construction <br /> of a new 12 " Master Planned Water Main extension on Old Dixie Highway , from the south side of <br /> 53 "d St. , south approximately 945 If and terminating with a fire hydrant and valve ; and provide for the <br /> necessary utility modifications to existing water mains , sewer mains and non - potable re- use water <br /> mains lying within or adjacent to 53 "d St. from the FEC railroad to Indian River blvd . , and within or <br /> adjacent to Old Dixie Highway from a point approximately 900 ft. south of 53 ` 1 St. to a point <br /> approximately 900 north of 53 '`' St . <br /> The new water main extension is necessary to provide construction of a master planned water <br /> main that will serve future commercial customers along Old Dixie Highway corridor. The <br /> conshuction is necessary at this time so that it. is completed prior to or in conjunction with the Old <br />
The URL can be used to link to this page
Your browser does not support the video tag.